Type : Bid Notification
Scope Project Scope description: Lakeview Park - Repair Existing Trellis Structure, Concrete Pad with Foundation and Shade Structure (10’x10’), and 4” Concrete Sidewalk Stony Brook Park - Wood-Frame Gazebo Structure, Demotion Existing Sidewalk, and 4” Concrete Sidewalk Holly Park - Construction of New Header Curb, 4” Concrete Base, Game Time Poured in Place playground surface (cushion and base), Game Time Huron Peak Playground Structure, Game Time Square Hip Shade Structure (44’x34’), and 4” Concrete Sidewalk Refer to contract documents, plans and specifications for additional information.