SOLICITATION NOTICESPMYM323Q1101PLEASE SEE ATTACHED SOLICITATION.Delivery is requested as soon as possible (non-expedited pricing).Solicitation attachments:SPMYM323Q1101 SolicitationSPMYM323Q1101 J&A RedactedPre-Solicitation Notice found here: https://sam.gov/opp/695341f06b5a4c3ba151844c507f109d/review
02 Feb. 2023COMBINED SYNOPSIS/SOLICITATIONThis is a COMBINED SYNOPSIS/SOLICITATION for commercial items prepared in accordance with the information in FAR Subpart 12, using Simplified Acquisition Procedures, as supplemented with the additional information included in this notice. This announcement constitutes the only solicitation; a written solicitation will not be issued. Paper copies of this solicitation will not be available. This combined synopsis/solicitation SHALL be posted on Beta.SAM. The Request for Quotation (RFQ) number is N3904021Q0059. This solicitation documents and incorporates provisions and clauses in effect through FAC 2022-1128 and DFARS Change Notice 2022-0928. It is the responsibility of the contractor to be familiar w...
Please see attached.
See attached solicitation and associated documents for specifications, instructions and details. Complete the attached security form and include your company's current DD2345 form when requesting the referenced drawing(s).
This is a COMBINED SYNOPSIS/SOLICITATION for commercial items prepared in accordance with the information in FAR Part 13, using Simplified Acquisition Procedures, as supplemented with the additional information included in this notice. This announcement constitutes the only solicitation; a written solicitation will not be issued. Paper copies of this solicitation will not be available. This combined synopsis/solicitation SHALL be posted on sam.gov. The RFQ number is N3904023Q0078. This solicitation documents and incorporates provisions and clauses in effect through FAC 2022-001 and DFARS Change Notice 2021-1230. It is the responsibility of the contractor to be familiar with the applicable clauses and provisions.The NAICS code is 541330 and ...
The information provided herein is to serve as an introduction for prospective vendors who may wish to join the Portsmouth Naval Shipyard Fastener Program. This special notice does not constitute a sources sought, presolicitation notice, nor does further engagement implicate the government in an award or agreement. The Portsmouth Naval Shipyard Fastener Program Basic Ordering Agreement (BOA) book is a catalog of technical procurement requirements for fasteners designated for use in critical defense applications. Due to the critical nature of these fasteners, they require the highest level of quality assurance, material control, and attention to detail. The primary source for design, material, testing, and quality assurance requirements of t...
This Request for Proposal (RFP) is to competitively procure, via Lease, the use of approximately 27,296 SF of climate controlled, secure industrial space for the U.S. Navy to accommodate fabrication, repair and installment of containment items for Shop 75 (Sail Loft) located at Portsmouth Naval Shipyard (PNSY) Kittery, Maine. The required minimum of 27,296 square feet of industrial space includes approximately 4,850 SF of Personnel Space. This space may be situated on separate floor or combined on a single floor.
The Government, Portsmouth Naval Shipyard, located in Kittery, Maine has a requirement for an IDIQ with 1 base year and four option years for couplers in accordance with the attached statement of work. See Statement of work for cable specifications. NOTE: Offerors must complete the provisions 52.204-24, 52.204-26, 252.204-7016, and 252.204-7019. The provisions are located on the SF-18
The City of South Portland annually adjusts approximately 100 manhole castings per year to support the City’s paving program. The manhole castings consist of sanitary, catch basin, and drain manhole types. The City’s paving work will be done between the 3 rdweek of April and the 3 rdweek of November. The unit prices for this bid shall be based on holding these prices based on a three year contract. Also there are no guarantees to the number of manholes per year. Payment will be based on satisfactory acceptance by the City for the actual work completed. The City reserves the right to continue or reject this contract hereafter for years 2 and/or 3. If the City opts to continue or reject the contract for years 2 and/or 3, they will submit to t...