Search results for: "La Grande, Oregon"

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 849
Looking for opportunities in Oregon, United States?
  • 2023-29 Martha Anne Dow Center for Health Professions Building - Liebert Replacement Project

    Type : Bid Notification

    Due : 07 Dec, 2023 (in 2 days)
    Posted : 17 days ago
    Started : 02 Nov, 2023 (1 month ago)

    The purpose of this RFQ is to hire a qualified Contractor to remove and replace two (2), five-ton Liebert Mini Mate units with humidification. The purpose of these units is to providing cooling climate for medical imaging equipment that is located in the Martha Anne Dow Center for Health Professions Building, specifically Rooms No. 111 and 112.

    From: Oregon Public Universities (State)

  • China Hat Well Water System Update

    Type : Bid Notification

    Due : 19 Dec, 2023 (in 15 days)
    Posted : 6 days ago
    Started : 27 Nov, 2023 (6 days ago)

    The USDA Forest Service (FS), Procurement & Property Services (PPS), Special Projects Operations Center (SPOC), Northwest Branch is issuing this synopsis as a means of complying with the USDA’s policy in the Contracting Desk Book, SUBPART 413.3—SIMPLIFIED ACQUISITION METHODS, 413.303 Blanket Purchase Agreements (BPAs). The USDA FS intends on awarding a competitive BPA Call Order against multiple award schedule BPAs for Northwest Facilities Maintenance (FMAC) located at USDA’s Contract Portal, awarded against solicitation number: 1204M320Q0041 to perform testing of control panel and cable testing, evaluation of existing control systems and other equipment, and replacement of some components for the USFS China Hat Well Water System.Please see...

    From: Federal Government (Federal)

  • USDA-ARS-PWA CHNS Combustion Analyzer Pendleton OR

    Type : Bid Notification

    Due : 05 Jan, 2024 (in 1 month)
    Posted : 4 days ago
    Started : 29 Nov, 2023 (4 days ago)

    This is a combined synopsis/solicitation for commercial items prepared in accordance with the procedures contained in FAR Part 12.6, Acquisition of Commercial Items, and FAR Part 13, Simplified Acquisition Procedures, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.The solicitation number is 12905B24Q0015 and is issued as a Request for Quotation (RFQ).The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) Number 2024-01.This solicitation is issued as a 100% Total Small Business Set-Aside. The associated NAICS code is 334516...

    From: Federal Government (Federal)

  • RFP 2023-24-06 EOU Bookstore Operations

    Type : Bid Notification

    Due : 29 Nov, 2023 (5 days ago)
    Posted : 1 month ago
    Started : 14 Nov, 2023 (20 days ago)

    The selected proposer Contractor shall operate the Bookstore, in accordance with the requirements, terms, specifications, conditions, and provisions contained in final management negotiated between the parties that is in compliance with Internal Revenue Service, Revenue Procedure 97-13 as described in section 5.03(4) thereof (contemplating a fixed fee arrangement), and which shall also include terms substantially similar to those found in the sample contract. The Contractor shall provide EOU with the services usually expected of a top quality university bookstore.

    From: Oregon Public Universities (State)

  • Architectural and Engineering Services for SOU Softball Complex Upgrades

    Type : Bid Notification

    Due : 01 Dec, 2023 (2 days ago)
    Posted : 20 days ago
    Started : 30 Oct, 2023 (1 month ago)

    The SOU Softball complex was originally the baseball field until the baseball program was canceled in the early 1980’s. The field, dugouts, bleachers and press box have not been changed or upgraded since 2001. The concession stand has been converted to the team’s locker room and a hitting facility was erected in 2015. The field currently has a dirt infield and natural grass outfield. We are looking for an Architecture/Design Firm to provide design services to upgrade

    From: Oregon Public Universities (State)

  • S - Wallowa-Whitman Sno-Park Snow Removal: Clear Creek Sno-Park & Catherine Creek Summit Sno-Park

    Type : Bid Notification

    Due : 07 Nov, 2023 (26 days ago)
    Posted : 1 month ago
    Started : 24 Oct, 2023 (1 month ago)

    The Forest Service anticipates making multiple awards to different Offeror’s based on each of the Sno-Parks.Work shall be completed during the Winter Sno-Park seasons of November 20th through April 30th during contract period.Contractor shall regularly check snow depths on the roads and parking areas, and shall plow entire area when average snow depth at the parking area reaches or exceeds a trigger depth of 6” of snow accumulation. The Contractor shall contact COR for authorization prior to conducting maintenance on access roads when 6” snow depth trigger is not reached in parking areas (occurs infrequently; typically due to drifting caused by heavy wind). Snow removal shall typically avoid high traffic periods between 10 a.m. and 3 p.m.Cl...

    From: Federal Government (Federal)

  • F - Grande Ronde Restoration Project

    Type : Bid Notification

    Due : 14 Nov, 2023 (19 days ago)
    Posted : 1 month ago
    Started : 02 Nov, 2023 (1 month ago)

    The Grande Ronde Restoration Project involves: (1) Habitat restoration on 1.25 miles of the Grande Ronde River (Vey Meadows); (2) Gravel Haul from the Mine Tailings Reach (Upper Grande Ronde River) to staging sites adjacent to the Middle Grande Ronde River; (3) 15 miles of small streams (Spring Creek (4.5 miles), South Fork Spring Creek (2 miles), Dark Canyon Creek (3.5 miles), Little Dark Canyon Creek (1.25 miles), Pelican Creek (.25 mile), California Gulch (1.5 miles), and Dry Creek (2 miles) (refer to maps). The project would prioritize LWD (channel spanning log jams, whole trees and small wood material) and gravel placement to add roughness, increase floodplain interaction and habitat complexity, and promote out of channel flooding. It ...

    From: Federal Government (Federal)

Refine your Search
Apply several filters to get precise search results