Trash and Recycle Service for Davis Dam
DLA-Energy has requested USACE conduct API External Inspections at Creech AFB, NV on facilities 667 & 669 in accordance with all laws standards, federal regulations, as well as any state and local regulations and guidelines.General Notes:- Read the first paragraph of clause FAR 52.212-3 Alt I (Deviation) in the solicitation carefully. You may not need to complete the entire provision.
The work is located in Henderson, Nevada, adjacent to and within the divided median of the Boulder Highway. Items of work include the removal of existing turf, concrete headers, trees, modification to the existing irrigation system, addition of tree rings for irrigation, decomposed granite and maintenance of the existing landscaping during construction.
****BCN Purchasing will no longer accept hard copy bid documents in response to any solicitation including, but not limited to: ITB, RFP, RFQ, or CMAR solicitations. All documents must be submitted electronically via this website. **NSHE recently migrated to a new payment system that requires all of our vendors register with the system in order for our Controllers office to allow us to pay you. Please visit the following link for the NSHE Supplier Registration system to sign up for a new account: https://suppliers.nevada.edu/Membership/Secure/CreateUser.aspx. This process only needs to be completed once. If you believe you already ...
Project: Professional Engineering Services for On Demand Quality Assurance Agency Third Party Construction Inspection Services Ref. #: 606391-22 Department: Procurement Type: RFSQ Status: Open Open Date: Dec 29th 2022, 6:00 AM PST Questions Due Date: Jan 24th 2023, 5:00 PM PST Close Date: Feb 9th 2023, 3:00 PM PST Days Left: 7 Project Description:Clark County is soliciting Statement of Qualification submittals from qualified firms to provide professional services for County capital projects. Firms, which have been qualified, will be put on a rotation list, approved by the Board of County Commissioners, for the purpose of providing On Demand Quality Assurance Agency Third Party Construction Inspection Services. Important Events:OngoingOpen D...
SCOPE OF WORK: The Work to be performed under these Contract Documents is generally described as follows: Removal and replacement of twenty (20) primary sludge pumps with accompanying variable frequency drives (VFDs), construction of a primary sludge screening facility, screened primary sludge splitting box, 4 new 80-foot diameter covered thickening tanks, thickener overflow pumping station, thickened primary sludge pumping station, electrical building, foul air biofilters, and all piping and appurtenances. ESTIMATED COST: The Engineer's estimate is in the $90,000,000 to $100,000,000 range
The Reno-Tahoe Airport Authority (RTAA) has issued this Invitation to Bid (ITB) with the sole purpose and intent of obtaining sealed bids (Bid) from qualified contractors (Contractor) to reconstruct terminal loop road (Project). If awarded, a contract (Contract) will be effective on the date the Contract is approved by the RTAA Board of Trustees, signed by all required parties, and filed with the Manager of Purchasing and Materials Management. However, the RTAA reserves the right to not award a contract for any work herein; issuance of this ITB does not guarantee any subsequent award. Furthermore, the RTAA reserves the right to hire any additional contractors or consultants as needed at its discretion. It is the intent of the RTAA to select...
The Las Vegas Valley Water District invites qualified firms (Bidders) to submit Bids for the following work, see Contract Documents for full details. The Sites of the Work include public rights-of-way in which the District owns or operates water facilities and properties within Las Vegas, Nevada; Blue Diamond, Nevada; Jean, Nevada; Kyle Canyon, Nevada; Laughlin, Nevada; and Searchlight, Nevada; at which maintenance and/or repair work is directed by the District. Required services will be related to maintaining water distribution pipelines, valves, hydrants, vaults, backflows, associated water delivery facilities, emergency repairs, and site restorations. Work shall consist of, but not be limited to, marking the work area in white, notifying...
****BCN Purchasing will no longer accept hard copy bid documents in response to any solicitation including, but not limited to: ITB, RFP, RFQ, or CMAR solicitations. All documents must be submitted electronically via this website. **NSHE recently migrated to a new payment system that requires all of our vendors register with the system in order for our Controllers office to allow us to pay you. Please visit the following link for the NSHE Supplier Registration system to sign up for a new account: https://suppliers.nevada.edu/Membership/Secure/CreateUser.aspx. This process only needs to be completed once. If you believe you already ...