Search results for: "Normal, Illinois"

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 8,984
Looking for opportunities in Illinois, United States?
  • COMMODITIES FOR USG FOOD DONATIONS: 2000009814/4100029108/BEEF FINE GROUND FRZ CTN-40 LB

    Type : Contract

    Due : 31 Mar, 2024 (in 2 days)
    Posted : 2 months ago
    Started : 23 Jan, 2024 (2 months ago)

    COMMODITIES FOR USG FOOD DONATIONS: 2000009814/4100029108/BEEF FINE GROUND FRZ CTN-40 LB Solicitation ID/Procurement Identifier: 123J1424B0172 Ultimate Completion Date: Sun Mar 31 17:00:00 GMT 2024

    From: Federal Procurement Data System (Federal)

  • 550-24-203 REPLACE ROOF B-98 AMBULANCE BAY & B-58 CHILLER AREA ROOF

    Type : Contract

    Due : 03 Apr, 2024 (in 5 days)
    Posted : 2 months ago
    Started : 04 Jan, 2024 (2 months ago)

    550-24-203 REPLACE ROOF B-98 AMBULANCE BAY & B-58 CHILLER AREA ROOF Solicitation ID/Procurement Identifier: 36C25224B0002 Ultimate Completion Date: Wed Apr 03 17:00:00 GMT 2024

    From: Federal Procurement Data System (Federal)

  • Concrete Bridge Deck Crack Sealing

    Concrete Bridge Deck Crack Sealing

    Type : Contract

    Due : 31 Mar, 2024 (in 1 day)
    Posted : 8 days ago
    Started : 06 Mar, 2024 (23 days ago)

    R27-SP62 Concrete Bridge Deck Crack Sealing 3/31/2024 Concrete in a bridge deck is exposed to various conditions that make it prone to cracking such as loads from trucks, temperature variations and deicing chemicals. The aim of this project is to determine the appropriate crack sealer for various types of cracks in bridge decks. Researchers will create a guide for bridge maintenance engineers to assist with selecting the optimum crack sealer for each crack type. Effectively selecting crack sealers will allow engineers to seal cracks more cost-effectively as well as create more durable bridges. https://apps.ict.illinois.edu/projects/view.asp?id...

    From: Illinois Center for Transportation (Transportation)

  • EXPERT REVIEW OF FIRE INSURANCE-SMOKE INDEX FOR CONTRACTING INFORMATION: PEDRO ARRITOLA-VAZQUEZ AT PEDRO.ARRITOLA-VAZQUEZ@USDA.GOV.

    EXPERT REVIEW OF FIRE INSURANCE-SMOKE INDEX FOR CONTRACTING INFORMATION: PEDRO ARRITOLA-VAZQUEZ AT PEDRO.ARRITOLA-VAZQUEZ@USDA.GOV.

    Type : Contract

    Due : 08 Apr, 2024 (in 10 days)
    Posted : 22 days ago
    Started : 06 Mar, 2024 (22 days ago)

    EXPERT REVIEW OF FIRE INSURANCE-SMOKE INDEX FOR CONTRACTING INFORMATION: PEDRO ARRITOLA-VAZQUEZ AT PEDRO.ARRITOLA-VAZQUEZ@USDA.GOV. Solicitation ID/Procurement Identifier: 12FPC123A0012 Ultimate Completion Date: Mon Apr 08 17:00:00 GMT 2024

    From: Federal Procurement Data System (Federal)

  • NCAUR WATER SOFTENER REPLACEMENT - ROOM 0201

    NCAUR WATER SOFTENER REPLACEMENT - ROOM 0201

    Type : Contract

    Due : 15 Jun, 2024 (in 2 months)
    Posted : 14 days ago
    Started : 15 Mar, 2024 (13 days ago)

    NCAUR WATER SOFTENER REPLACEMENT - ROOM 0201 Solicitation ID/Procurement Identifier: 12505B24Q0020 Ultimate Completion Date: Sat Jun 15 17:00:00 GMT 2024

    From: Federal Procurement Data System (Federal)

  • Mechanistic - Empirical Design Procedures for Flexible Pavements

    Mechanistic - Empirical Design Procedures for Flexible Pavements

    Type : Contract

    Due : 15 May, 2024 (in 1 month)
    Posted : 8 days ago
    Started : 06 Mar, 2024 (23 days ago)

    R27-233 Mechanistic - Empirical Design Procedures for Flexible Pavements 5/15/2024 Design procedures and policies for flexible (asphalt) pavements are continually evolving. This project aims to review the Illinois Department of Transportation’s current design method and policy documents. Researchers will make recommendations to ensure that the design processes reflect the latest technology. Improved pavement designs are expected to result in cost savings and improved long-term pavement performance. https://apps.ict.illinois.edu/projects/view.asp?id=2447

    From: Illinois Center for Transportation (Transportation)

  • Cone Penetration Testing (CPT) for Illinois Subsurface Characterization and Geotechnical Design

    Cone Penetration Testing (CPT) for Illinois Subsurface Characterization and Geotechnical Design

    Type : Contract

    Due : 31 May, 2024 (in 2 months)
    Posted : 8 days ago
    Started : 06 Mar, 2024 (23 days ago)

    R27-210 Cone Penetration Testing (CPT) for Illinois Subsurface Characterization and Geotechnical Design 5/31/2024 Engineers use the cone penetration test to determine detailed information about the properties and strength parameters of soil. This test, which collects data continuously, is faster and provides more consistent data than the currently used standard penetration test, in which a hollow stem auger is positioned into the ground at 2.5- to 5-foot intervals to retrieve soil samples. The goal of this project is to develop guidelines and a manual for the cone penetration test. These resources will help the Illinois Department of Transportation obtain more reliable data and lower the risk in roadway and geotechnical designs, thereby red...

    From: Illinois Center for Transportation (Transportation)