Type : Bid Notification
Paducah Housing Authority Paducah, KY On-call Plumbing/Sewer & Drain Services B24003 11 04/09/2024 05/03/2024
Paducah Housing Authority Paducah, KY On-call Plumbing/Sewer & Drain Services B24003 11 04/09/2024 05/03/2024
Paducah Housing Authority Paducah, KY Rehabilitation of 5 Vacant Units and 3 Minor Roof Repairs S24003 8 04/19/2024 05/08/2024
Paducah Housing Authority Paducah, KY Rehabilitation of 10 Vacant Units and 3 Minor Roof Repairs 24002 13 03/13/2024 04/03/2024
THIS REQUIREMENT IS RE-ISSUED TO REPLACE SOLICITATION W912EQ24B0003....The work consists of furnishing all plant, labor and materials for renovation of structural and mechanical features at 11 culvert structures located in Lake County, Tennessee, Fulton County, Kentucky, and Pulaski County, Illinois. Renovations include replacing manual gate operators and associated work, installing new slotted galvanized stem covers, providing portable actuators to sponsors, replacement of safety chains and handrails, repainting of structural components, and repair of concrete and any incidental related work according to the specifications and plans. There are three (3) attachments---(1) Solicitation (2) Plans-Volume 1-System 3 and (3) Plans-Volume 2-Syste...
Sources SoughtBarkley Lock Spillway Gate Chain Replacement Classification Code:9520 - Structural Shapes, Iron and SteelNAICS Code:332312 – Fabricated Structural Metal ManufacturingSmall Business Size Standard – 500 employeesTHIS IS NOT A SOLICITATION, INVITATION FOR BID, REQUEST FOR QUOTE (RFQ) OR A REQUEST FOR PROPOSAL (RFP).THIS IS A SOURCES SOUGHT ANNOUNCEMENT ONLY. THIS SOURCES SOUGHT IS FOR ACQUISITION PLANNING PURPOSES ONLY AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT TO ISSUE A SOLICITATION OR ULTIMATELY AWARD A CONTRACT. ANY COST INCURRED AS A RESULT OF THE ANNOUNCEMENT SHALL BE BORNE BY THE INTERESTED PARTY (PROSPECTIVE OFFEROR) AND WILL NOT BE CHARGED TO THE GOVERNMENT FOR REIMBURSEMENT. RESPONDENTS WILL NOT BE NOT...
Paducah Housing Authority Paducah, KY Wind-damaged Roof Repairs (100 Bridge Court) 24001 1 02/02/2024 02/28/2024
***AMDT 0002 Posted****Question: In regards to the Smithland Lock and Dam Waterline project, if it is determined that a new meter is required how will the meter cost be covered? Will the meter cost be paid under Line Item: AMEND 001 - 100LF? If this is the case how will this be invoiced?Answer: If a new water meter is determined to be needed. The meter cost would be associated with base item 001 replacement of 1000 LF of 4” HDPE and tied into water meter. See attached AMDT 0002; no further questions will be considered, due date for quotes is hereby extended to 04 March 2024 at 03:00PM ET.****AMDT 0002 Posted********AMDT 0001 Posted****The scope of work and price breakout schedule have been replaced in their entirety; all changes have been m...