Search results for: "Seattle, Washington"

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 38,841
Looking for opportunities in Washington, United States?
  • WPTP Raw Sewage Pumps (RSP) and Grit Classifier Replacement Project

    WPTP Raw Sewage Pumps (RSP) and Grit Classifier Replacement Project

    Type : Bid Notification

    Due : 30 Apr, 2024 (Today)
    Posted : 1 month ago
    Started : 05 Mar, 2024 (1 month ago)

    Solicitation Type Construction Solicitation Status Active Buyer Patrisha Roth Email troth@kingcounty.gov Synopsis The objective of this project is to increase the firm capacity of the raw sewage pump (RSP) station from 330 million gallons per day (MGD) to 440 MGD at West Point Treatment Plant in Seattle by replacing the existing biogas driven engine pumps with higher capacity electric motor driven pumps. The project will also make seismic upgrades to the pump station and make improvements to meet National Fire Protection Association (NFPA 820) standards. In addition, the project will also replace the existing boiler system prior to completion of the RSP replacement to provide heat ne...

    From: King County (County)

  • VACUUM HOSE

    VACUUM HOSE

    Type : Bid Notification

    Due : 30 Apr, 2024 (Today)
    Posted : 27 days ago
    Started : 02 Apr, 2024 (27 days ago)

    SOURCES SOUGHT SYNOPSIS (HOSE, VACUUM)The Defense Logistics Agency Maritime Puget Sound is issuing this sources sought and request for information as a means of conducting market research to identify parties having an interest in and the resources to support an Indefinite Delivery Indefinite Quantity contract for:(1) HOSE,VACUUM NSN: LL-S05-23744" ID, CONVOLUTED EXTERIOR, SMOOTH INTERIOR(100 FT/ROLL) FLEXIBLE PVC OUTER W/RIGID PVC HELIX,POLYURETHANE LINER,BLK CARSTON, (UNISOURCE 1800-400 UNACPT)PN UF1-400X100 MFR KURIYAMA OF AMERICA INC FSCM 0ABC1 ADDED DATA 1 0ABC1UF1-400X100(2) HOSE, VACUUM 5" NSN: LL-S05-3854CONVOLUTED EXTERIOR, SMOOTH INTERIOR, BLACK100 FT PER ROLLWINDY ORMSBY C/909 PN UF1-500X100MFR KURIYAMA OF AMERICAN FSCM 0ABC1ADDED...

    From: Federal Government (Federal)

  • RDTE Equipment (NISE Project)

    RDTE Equipment (NISE Project)

    Type : Bid Notification

    Due : 30 Apr, 2024 (Today)
    Posted : 13 days ago
    Started : 16 Apr, 2024 (13 days ago)

    The Naval Undersea Warfare Center Division, Keyport is issuing this sources sought notice as a means of conducting market research to identify parties having the resources and interest in RDTE Equipment (NISE Project). This request for capability information does not constitute a Request for Proposal (RFP); submission of any information in response to this announcement is purely voluntary and the Government assumes no financial responsibility for any costs incurred. Please complete the attached "Questionnaire for Industry" word document, and return via email to naomi.n.mckenzie.civ@us.navy.mil no later than the response date and time identified on this notice. DO NOT INCL...

    From: Federal Government (Federal)

  • WSU - Rogers and Orton Halls Exterior Repairs

    Type : Bid Notification

    Due : 01 May, 2024 (Tomorrow)
    Posted : 26 days ago
    Started : 20 Mar, 2024 (1 month ago)

    Washington State University Rogers and Orton Halls Exterior Repairs Pullman, WA Sealed bids are being requested by the Board of Regents of Washington State University, for the above referenced project. Project Scope: Rogers and Orton Halls are 12 story student dorms on the Pullman campus of Washington State University. The condition of the exterior columns are showing signs of water damage and subsequent deterioration at floor levels 4, 7, 11 and at splice joints on the columns at the West and East side of both halls. Project Physical address: Rogers Hall- 1355 SE Olympia Ave Pullman, WA 99164 Orton Hall- 1475 SE Olympia Ave Pullman, WA 99164 Bid Estimate: $300,000-$350,0000 Bid Deadline: May 1, 2024, prior to 2:00 p.m., virtual bid opening...

    From: Washington State Office of Minority and Women (State)

  • Clark County - School Environmental Certification and Events

    Type : Bid Notification

    Due : 01 May, 2024 (Tomorrow)
    Posted : 19 days ago
    Started : 27 Mar, 2024 (1 month ago)

    Clark County (WA) is soliciting proposals for: Request for Proposal #890 School Environmental Certification and Events The Request for Proposal documents are available to view at: https://clark.wa.gov/internal-services/request-proposal-1 Proposals shall be received in the Office of Purchasing, 1300 Franklin Street, Suite 650, Vancouver, Washington 98660, until, but not later than 1:30 pm Wednesday, May 1, 2024. Title VI Statement Clark County, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 2000d‐4) and the Regulations, hereby notifies all bidders that it will affirmative...

    From: Washington State Office of Minority and Women (State)

  • 24-RFQ-035 Wireline Ethernet or Fixed Wireless Services

    Type : Bid Notification

    Due : 01 May, 2024 (Tomorrow)
    Posted : 19 days ago
    Started : 27 Mar, 2024 (1 month ago)

    CTS is seeking Wireline Ethernt or Fixed Wireless Services. Vendors must have both an MSA and the applicable addenda on file in order to participate and/or bid. Please read the RFQ in its entirety. The RFQ can be found on our website at: https://watech.wa.gov/procurement-announcements Closing Date: Wednesday, May 1, 2024Organization: Consolidated Technology ServicesPoint of Contact: susan.steele@watech.wa.gov

    From: Washington State Office of Minority and Women (State)

  • Coal Creek Fish Passage Construction

    Type : Bid Notification

    Due : 01 May, 2024 (Tomorrow)
    Posted : 25 days ago
    Started : 20 Mar, 2024 (1 month ago)

    Project overview: Trout Unlimited is seeking a contractor to provide equipment, labor, and materials to remove a fish passage barrier culvert and one additional culvert from a private road crossing of Coal Creek. The crossing will be replaced with a 24-foot-long x 12’-6” wide, pre-engineered, and prefabricated concrete bridge planks, abutment wall, wingwalls, and bridge sills. Description of Project: Coal Creek Fish Passage Restoration Project The project includes the following elements: • Removing one 36" dia. x 26' long concrete culvert with cmp extension section and one 24” x 20’ long cmp along with associated fill material from a private road crossing of Coal Creek. • Replacing the crossing with a 24-foot-long x 12’-6” wide, pre-enginee...

    From: Washington State Office of Minority and Women (State)