  • Western Avenue I-91 Water Main Bridge Crossing, Brattleboro, VT

    Type : Contract
    Due : 17 Aug, 2017 (about 5 years ago)
    Posted : about 5 years ago
    Started : 24 Jul, 2017 (about 5 years ago)

    Removal of an existing 12-inch bridge-supported water main, installation of a new 12-inch bridge supported water main, and miscellaneous site work, testing and cleanup.

    From: Vermont (State)
  • EUREKA ROAD IMPROVEMENTS PHASE 2 - SPRINGFIELD

    Type : Contract
    Due : 09 Jun, 2022 (8 months ago)
    Posted : 8 months ago
    Started : 11 May, 2022 (8 months ago)

    The Project includes the following Work: Roadway and drainage improvements for approximately 2,000 linear feet of road.

    From: Vermont (State)
  • SHELDON HILL ROAD CULVERT (LOWER) CONSTRUCTION

    Type : Contract
    Due : 07 Jun, 2022 (8 months ago)
    Posted : 8 months ago
    Started : 16 May, 2022 (8 months ago)

    The Town of Wardsboro is seeking bids for the removal of a concrete pipe and the installation of a box culvert on Sheldon Hill Road at approximately 400' north of Route 100. Bids must be received by 4pm on June 7th and marked Sheldon Hill (Bottom) Culvert. Bids may be mailed to Town of Wardsboro, PO Box 48, Wardsboro, VT 05355 or dropped off at the Town Office at 71 Main Street, Wardsboro. A copy of the engineering plans may be obtained at the Town Office. The Selectboard reserves the right to accept or reject any and all bids. The Selectboard reserves the right to negotiate with winning bidder.

    From: Vermont (State)
  • Town of Mount Holly - FY23 Paving Village Area and Reclaim Hortonville

    Type : Contract
    Due : 31 Aug, 2022 (5 months ago)
    Posted : 5 months ago
    Started : 15 Aug, 2022 (5 months ago)

    Shim and overlay pave, 1220 tons, village area and reclaim portion of Hortonville Rd, 13500 sy.

    From: Vermont (State)
  • Town of Mount Holly - FY23 Paving Village Area and Reclaim Hortonville

    Type : Contract
    Due : 31 Aug, 2022 (5 months ago)
    Posted : 5 months ago
    Started : 15 Aug, 2022 (5 months ago)

    Shim and overlay pave, 1220 tons, village area and reclaim portion of Hortonville Rd, 13500 sy.

    From: Vermont (State)
  • Springfield Mineral Street Sidewalk Improvements

    Type : Contract
    Due : 07 Jul, 2022 (7 months ago)
    Posted : 7 months ago
    Started : 14 Jun, 2022 (7 months ago)

    The Project includes the following Work: Sidewalk, curb, and related improvements for approximately 750 lf on Mineral Street.

    From: Vermont (State)
  • Town of Bennington Water System Remedial Expansion Contracts #8 & #9

    Type : Contract
    Due : 05 Dec, 2019 (about 3 years ago)
    Posted : about 3 years ago
    Started : 25 Oct, 2019 (about 3 years ago)

    Separate sealed BIDS for the construction of Town of Bennington Water System Remedial Expansion, Contract #8: This project consists of the extension water main line along Chapel Road and East Road in the Town of Bennington, Vermont. Specifically, the work will include trenching, removal of the existing asphalt and subbase, installation of water main, thrust blocks, hydrants, curb stops, service lines, trenchless installation of water main under Furnace Brook, installation of a water main booster pump system, and associated site work in accordance with the contract plans and specifications. Town of Bennington Water System Remedial Expansion, Contract #9: This project consists of the extension of water main line along Chapel Road in the Town...

    From: Vermont (State)
  • Water System Remedial Expansion Contract #1

    Type : Contract
    Due : 31 Aug, 2017 (about 5 years ago)
    Posted : about 5 years ago
    Started : 08 Aug, 2017 (about 5 years ago)

    Town of Bennington Water System Remedial Expansion, Contract #1 – This project consists of the extension of water main line along North Bennington Road (VT Route 67A), Murphy Road, and Austin Hill Road in the Town of Bennington, Vermont. Specifically, the work will include trenching, removal of the existing asphalt and subbase, installation of water main, thrust blocks, hydrants, curb stops, service lines, sitework for placement and connection to a pre-fabricated pressure reducing valve vault (PRV) supplied by others and connection to the Town SCADA system, base material, trenchless installation of water main and sleeve under the Walloomsac River and North Bennington Road (VT Route 67A), an aerial crossing on an existing bridge utilizing TR...

    From: Vermont (State)
  • Roof Repair Work

    Type : Contract
    Due : 15 May, 2017 (about 5 years ago)
    Posted : about 5 years ago
    Started : 27 Apr, 2017 (about 5 years ago)

    To remove and replace roofing material of the North School as follows: 1. Prepare area with tarps to protect shrubs, landscaping 2. Remove old shingles, drip edge and tar paper 3. Install new painted white aluminum drip edge along edges of roof 4. Inspect chimney flashing for leaks 5. Re-nail all boards where required and repair any rotted areas using new boards of like kind. 6. 2 rows ice & water shield 7. Complete tar paper (30 lb.) 8. Install new 30-year architectural shingles 9. All debris to be removed from site and properly and legally disposed of 10. Dumpster to be located in a location dictated by Town 11. All labor: minimum 5-year warranty. All Material: minimum 30-year warranty by manufacturer. 12. All work to be completed prior ...