Type : Bid Notification
The Ashley National Forest is planning to replace the existing flushing restroom at Antelope Boat Ramp with a new precast flushing restroom. The flush building shall be designed to meet the following criteria: Men’s side shall include a sink, urinal, and one flushing toilet and the Women’s side shall include a sink and two flushing toilets The contractor shall fabricate, deliver, off-load, and set/assemble the new precast concrete restroom building. The contractor shall provide a toilet building that must be fully accessible and must meet the design standard for naturally ventilated, odor free buildings. The building will be a CXT TAOS or approved equivalent with a footprint of approximately 20’X26’. The precast concrete building shall be d...