Type : Bid Notification
All civil appurtenances shall be installed and affixed with the highest quality of workmanship.
All civil appurtenances shall be installed and affixed with the highest quality of workmanship.
Trench Box System
CATS is seeking a Contractor to conduct transit bus line inspection and secondary in-plant quality assurance services. The overall goal for these services is to ensure that each of the vehicles being produced is manufactured in compliance with 49 CFR Part 663, “Pre-Award and Post-Delivery Audits of Rolling Stock Purchases” regulations and 49 CFR 661 “Buy America” requirements; as amended by the “Fixing America’s Surface Transportation” (FAST) Act. These inspections also ensure that the vehicles comply fully with the specifications of the order, and ensure that each vehicle is free from defects.
409th Contracting Command, 928th Contracting Battalion (CBN) / Regional Contracting Office Bavaria (RCO) is issuing a solicitation to award a commercial, Single Award, Requirements (FFP), Indefinite Delivery Type (IDT) contract for the Inspection of Railroad Facilities at USAG Bavaria (Grafenwoehr, Vilseck), Germany. This requirement will utilize low price technically acceptable evaluation factors in determining the successful offer. The FOB will be DESTINATION Germany. The Period of Performance will start 1 July 2024 and includes a one (1) year Base Period with four (4) one-year Option Periods IAW FAR Clause 52.217-9 (Option to Extend the Term of the Contract).
Prime Bidders & major subcontractors may receive a complete PDF set of plans and specifications upon request to the of the engineer: Wolf Trail Engineering, LLC, Attn: Lynne Baker, Phone # 704-282-0826, Email: Lynne@wolftrailengineering.com
Hybrid Meeting Upgrade to First Floor Conference Room Upgrade audiovisual equipment in City Hall’s First Floor Conference Room to enable full hybrid meeting capability for Board and Commission meetings.
Rehabilitation of 31 Stormwater Control Measures on 13 Town facilities following the corrective actions proposed by a third-party consultant who performed inspections of the Stormwater Control Measures. The rehabilitation is broken down into three phases spread over three fiscal years. Each phase involves rehabilitating one-third of the 31 stormwater control measures