Type : Bid Notification
326524 AIRPORT FBO HANGAR WEST ROOF OVERLAY PROJECT Work shall include but not necessarily be limited to: Overlay the existing 30,400 square foot roof on large unheated aircraft hangar with a 60mil reinforced EPDM roof system. The job consists of two separate roofs; the upper roof is approximately 100' x 200' and the lower roof is approximately 52' x 200', both are BUR roof system. The upper roof features two clerestory roofs with composite shingle roofing which are also to be overlaid. Work to be completed by November 30, 2024. A MANDATORY pre-bid meeting will be held April 17, 2024 at 9:30 a.m. PST in the Airport Terminal Conference Room located at 3000 Airport Way, Klamath Falls, OR. City's Estimate Range: $250,000 to $350,000 05/09/2024...