Install operable walls in MacAskill Room (approx. 130 m2) in order to better utilize meeting space. Consultant to ensure that the newly created spaces meet applicable codes and standards. Mechanical and electrical systems to be modified as required to suit space and structural support for operable walls to be verified. ... See more
You are hereby invited to submit price quotations for the above noted vehicle in accordance with the following guidelines and general specifications. These specifications will be followed where possible and any difference will only be of a minor nature with a written explanation. All bidders must submit a detailed specification summary. ... See more
Remove existing shingles and dispose of site as per Waste Disposal specification. Inspect existing sheathing for water damaged/dried-out spots and replace as required. Install new synthetic underlayment and 50-year architectural shingles over existing two and a half storey building - area of main building is approximately 1,007 square meters... See more