Refine your Search
Apply several filters to get precise search results




Loading Filters
Filters Applied Clear
Bid Notification
Pre-Bid Notification
Active
Refine your Search
Apply several filters to get precise search results

People also searched for

tunnel excavation
mdj0531042477
pipeline
bridge
underground
tbm
bore
shaft
pump station
congestion
Filters Applied Clear
Bid Notification
Pre-Bid Notification
Active
Search results for: Tunnel
Showing opportunity 1 - 10 of 49
  • Mountain Tunnel Improvements Project

    Type : Bid Notification
    Due : 30 Jan, 2020 (in 11 days)
    Posted : 2 months ago
    Started : 18 Nov, 2019 (2 months ago)

    slope stabilization involving rock scaling, soil nailing, rock bolting, slope mesh installation and controlled blasting.

    From: San Francisco Public Utilities Commission (Utilities)
  • East of Hills System Study Project - Tunnel Alignment Studies

    Type : Bid Notification
    Due : 23 Jan, 2020 (in 4 days)
    Posted : 1 month ago
    Started : 11 Jan, 2020 (7 days ago)

    A consultant will prepare a conceptual planning level study for two tunnels; one from Walnut Creek Water Treatment Plant (WTP) to Lafayette WTP and the other from Orinda WTP to Lafayette WTP.

    From: East Bay Municipal Utility District (Utilities)
  • East Boise POE Tunnel Repair

    Type : Bid Notification
    Due : 27 Jan, 2020 (in 8 days)
    Posted : 8 days ago
    Started : 26 Dec, 2019 (23 days ago)

    FM32013 East Boise POE Tunnel Repair Out to Bid 01/27/2020 2:29:59 P.M. MT 01/27/2020 2:30 P.M. MT Project Manual Bid Set Plan Specifications/Drawings

    From: Idaho Department of Transportation (State)
  • I-70 EJMT TUNNELS

    Type : Bid Notification
    Due : 06 Feb, 2020 (in 18 days)
    Posted : 1 day ago
    Started : 13 Jan, 2020 (5 days ago)

    Proposal C21798 I-70 EJMT TUNNELS Proposal information tableDate Generated:01/13/2020Sections: 1 Date Revised: Amendments: 0Call Order: 002 Highway Number: Items: 65 Counties: CLEAR CREEK SUMMIT Project ID: STA0703-443 Not available for contractor viewing until 01/16/2020. Not yet available for contractor viewing. You must be logged in to view item data.

    From: Colorado Department of Transportation (State)
  • BID EXTENSION: CSO-FBAY-DES: FACILITY PLANNING AND DESIGN SERVICES FOR THE FLUSHING BAY COMBINED SEWER OVERFLOW STORAGE TUNNEL

    Type : Bid Notification
    Due : 07 Feb, 2020 (in 19 days)
    Posted : 8 days ago
    Started : 09 Jan, 2020 (9 days ago)

    BID EXTENSION: CORRECTION: The DEP seeks a consultant to provide Facility Planning and Design Services for the Flushing Bay Combined Sewer Overflow Storage Tunnel/Shafts and planning services for a dewatering pump station and the connection of the outfall to the tunnel.

    From: New York City (City)
  • Master Contract for Inceptor Sewer Tunnel Engineering

    Type : Bid Notification
    Due : 26 Nov, 2025 (in about 5 years)
    Posted : 23 months ago
    Started : 09 Feb, 2018 (23 months ago)

    ES 17P047 Master Contract for Inceptor Sewer Tunnel Engineering 2/9/2018 3/9/2018 RFP

    From: Minnesota Metropolitan Council (Other)
  • Construction of Balance Civil Works of Pancha Trench Weir, its Feeder Tunnel and Associated Works under the Scope of Lot PB-2B package (Lot PB2D-2) of Parbati HE Project (Stage-II)(Package No. C-547A)

    Type : Bid Notification
    Due : 25 Jan, 2020 (in 6 days)
    Posted : 7 days ago
    Started : 11 Jan, 2020 (7 days ago)

    Construction of Balance Civil Works of Pancha Trench Weir, its Feeder Tunnel and Associated Works under the Scope of Lot PB-2B package (Lot PB2D-2) of Parbati HE Project (Stage-II)(Package No. C-547A) Tender Value in ₹:- Should Allow NDA Tender:- No 

    From: Government of India (Federal)
  • Consultancy Services for Carrying out Feasibility Study and Detailed Project Report of Jalori Pass Tunnel (4.200 Km.) including approaches on Sainj (0.00)-Luhri- Aut (97.00) Road NH-305 from Km. 46.080 to Km. (57.00) in the State of Himachal Pradesh.

    Type : Bid Notification
    Due : 28 Jan, 2020 (in 9 days)
    Posted : 28 days ago
    Started : 21 Dec, 2019 (28 days ago)

    Consultancy Services for Carrying out Feasibility Study and Detailed Project Report of Jalori Pass Tunnel (4.200 Km.) including approaches on Sainj (0.00)-Luhri- Aut (97.00) Road NH-305 from Km. 46.080 to Km. (57.00) in the State of Himachal Pradesh. Tender Value in ₹:- Should Allow NDA Tender:- No 

    From: Government of India (Federal)
  • Kansas and Marin Streets Wet Weather Conveyance Tunnel

    Type : Bid Notification
    Due : 20 Jun, 2022 (in about 2 years)
    Posted : 8 months ago
    Started : 07 May, 2019 (8 months ago)

    The Project proposes to construct approximately 900 feet of underground sewer tunnel and connecting underground sewer structures. What to Expect: Sewer service in the area will NOT be interrupted during construction. Businesses and residents in the work zone will maintain access to their driveways and entrances during construction. Neighbors may hear construction noise periodically.

    From: San Francisco Public Utilities Commission (Utilities)
  • RFQ for DB-131 Kansas and Marin Streets Wet Weather Conveyance Tunnel

    Type : Bid Notification
    Due : 20 Jun, 2022 (in about 2 years)
    Posted : 8 months ago
    Started : 07 May, 2019 (8 months ago)

    The Project proposes to construct approximately 900 feet of underground sewer tunnel and connecting underground sewer structures. What to Expect: Sewer service in the area will NOT be interrupted during construction. Businesses and residents in the work zone will maintain access to their driveways and entrances during construction. Neighbors may hear construction noise periodically.

    From: San Francisco Public Utilities Commission (State)