Refine your Search
Apply several filters to get precise search results
Filters Applied Clear
Bid NotificationPre-Bid NotificationAwardContractActiveArchived
Search results for: Tunnel
Showing opportunity 1 - 10 of 2,763
  • Scott Parker Wentz Tunnel Rehabilitation

    Type : Bid Notification
    Due : 28 Jun, 2021 (in 9 days)
    Posted : 12 days ago
    Started : 06 Jun, 2021 (12 days ago)

    Open Scott Parker Wentz Tunnel Rehabilitation Scott Parker Wentz Tunnel Rehabilitation Open 6/6/2021 12:00 AM CDT Close 6/28/2021 3:00 PM CDT Type PRO Number OSUA&M-PRO-001107-2021 Contact Nicole Zoellner nicole.zoellner@okstate.edu Details View as PDF Respond Now

    From: Oklahoma State University System (State)
  • Brien McMahon High School - Pipe Tunnel Ventilation and Unit Ventilator Renovations (Re-Bid)

    Type : Bid Notification
    Due : 22 Jun, 2021 (in 3 days)
    Posted : 10 days ago
    Started : 07 Jun, 2021 (11 days ago)

    The City of Norwalk is re-bidding the Brien McMahon High School Pipe Tunnel Ventilationand Unit Ventilator Renovations Project which consists of installing extensions on the unitventilators in the “1200 Wing” of the building and installing fans in the Pipe Tunnels toprovide ventilation to the tunnels. This project consists General Trades, HVAC andElectrical Work. The budget for this project is $75,000.00.

    From: Norwalk (City)
  • 10 x 10 Supersonic Wind Tunnel (SWT) Expansion Joint #2 (EJ-2)

    Type : Bid Notification
    Due : 25 Jun, 2021 (in 6 days)
    Posted : 8 days ago
    Started : 09 Jun, 2021 (8 days ago)

    Expansion Joint #2 is a stainless steel bellows installed in the tunnel air circuit to allow for movement of the tunnel shell caused by thermal expansion and vibrations during tunnel operation. The joint is downstream of the test section in a subsonic region of the tunnel circuit. The joint is upstream of Cooler #1 that cools the air entering Compressor #1.

    From: Federal Government (Federal)
  • Notice of Intent to Sole Source Lifetyme Model 1652 Tunnel Boat

    Type : Bid Notification
    Due : 19 Jun, 2021 (Tomorrow)
    Posted : 3 days ago
    Started : 14 Jun, 2021 (4 days ago)

    Army Engineer Research and Development Center (ERDC) has a requirement to procure a Lifetyme Model 1652 Tunnel Boat for the ERDC Environmental Laboratory (EL).  The boat must be 16-ft in length, 52 inches in width, with at least a 24-inch side height.  These dimensions are necessary to hold the required research sampling gear and equipment without overloading the boat. 

    From: Federal Government (Federal)
  • Master Contract for Inceptor Sewer Tunnel Engineering

    Type : Bid Notification
    Due : 26 Nov, 2025 (in about 4 years)
    Posted : about 3 years ago
    Started : 09 Feb, 2018 (about 3 years ago)

    ES 17P047 Master Contract for Inceptor Sewer Tunnel Engineering 2/9/2018 3/9/2018 RFP

    From: Minnesota Metropolitan Council (Other)
  • PULLEY - TUNNEL CEILING

    Type : Bid Notification
    Due : 15 Jun, 2021 (3 days ago)
    Posted : 7 days ago
    Started : 10 Jun, 2021 (8 days ago)

    PULLEY - TUNNEL CEILING Bid Number: RQ77488 Solicitation Type: RFQ Due Date: 15-Jun-2021, 13:10:44 Status: Active

    From: Los Angeles Metropolitan Transit Authority (Transportation)
  • Lincoln Draw Tunnel Repair

    Type : Bid Notification
    Due : 15 Jun, 2021 (2 days ago)
    Posted : 1 month ago
    Started : 17 May, 2021 (1 month ago)

    Sealed bids, subject to the conditions contained herein, will be received by the City of Hays, Kansas, at the office of the City Clerk, City Hall, until 3:00 pm, prevailing time June 15, 2021, for the repairs to the Lincoln Draw Tunnel. Improvements include the repair of failures within the existing tunnel and the lining of approximately 1,956 LF of 66” to 72” diameter storm sewer tunnel with structural epoxy.

    From: City of Hays (City)
  • Kansas and Marin Streets Wet Weather Conveyance Tunnel

    Type : Bid Notification
    Due : 20 Jun, 2022 (in 12 months)
    Posted : about 2 years ago
    Started : 07 May, 2019 (about 2 years ago)

    Street parking will be impacted near construction zones. “No-parking” signs will be posted 72 hours in advance. Construction work hours will be provided when it is available and with future updates. Project Benefits: Increase hydraulic capacity of the sewer system, which may lead to a reduction of flooding risk during heavy rains. The new construction is designed to meet current seismic standards and sea level rise requirements.

    From: San Francisco Public Utilities Commission (Utilities)
  • WATERPROOF TUNNEL TO BLDG. 364 - PERRY POINT

    Type : Contract
    Due : 30 Jun, 2021 (in 11 days)
    Posted : 2 months ago
    Started : 01 Apr, 2021 (2 months ago)

    WATERPROOF TUNNEL TO BLDG. 364 - PERRY POINT Solicitation ID/Procurement Identifier: 36C24521R0040 Ultimate Completion Date: Wed Jun 30 17:00:00 GMT 2021

    From: Federal Procurement Data System (Federal)
  • Holland Tunnel – Replacement of Missing Tunnel Tiles at Tunnel Walls and Ceiling

    Type : Bid Notification
    Due : 23 Aug, 2017 (about 3 years ago)
    Posted : about 3 years ago
    Started : 21 Jul, 2017 (about 3 years ago)

    Title: Holland Tunnel – Replacement of Missing Tunnel Tiles at Tunnel Walls and Ceiling Agency: The Port Authority of New York and New Jersey Issue Date: 07/21/2017 Due Date: 08/23/2017 Location: See Document Category: Miscellaneous - Commodities Ad Type: General

    From: New York State Contract Reporter (State)