Type : Bid Notification
The campus is served by approximately 1.1 km of concrete sub-grade utility tunnels dating back to 1972. Most of the tunnel tops are at, or just below grade, and parts of the tunnel system show signs of water intrusion. The tunnel system generally runs from the Central Utility Building to most on-site buildings built before 2000.