Search results for: abandoned steam reheat

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 36
  • THE ABANDONED STEAM REHEAT COIL REMOVAL WILL BE PERFORMED AT THE POTTER STEWART COURTHOUSE IN CINCINNATI, OHIO.

    Type : Contract

    Due : 30 Nov, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 30 Aug, 2021 (about 2 years ago)

    THE ABANDONED STEAM REHEAT COIL REMOVAL WILL BE PERFORMED AT THE POTTER STEWART COURTHOUSE IN CINCINNATI, OHIO. Solicitation ID/Procurement Identifier: GS05P11SLD0111 Ultimate Completion Date: Tue Nov 30 18:00:00 GMT 2021

    From: Federal Procurement Data System (Federal)

  • Furnishing of labor, material, and equipment for the Southwest Elementary School Boiler Replacement

    Type : Bid Notification

    Due : 12 Jul, 2022 (21 months ago)
    Posted : 21 months ago
    Started : 28 Jun, 2022 (22 months ago)

    The Bidder agrees to execute the formal Contract within ten (10) days from the date of Notice of Award, and in case he fails or neglects to appear within the specified time to execute the Contract, he will be considered as having abandoned the Contract, and the Bid Security accompanying this Proposal will be forfeited to the Owner by reason of such failure on the part of the Bidder. H.

    From: Durham Public Schools (School)

  • HVAC UPGRADES AVALON THEATRE LOBBY AND STAGE

    Type : Bid Notification

    Due : 19 May, 2020 (about 3 years ago)
    Posted : about 4 years ago
    Started : 04 May, 2020 (about 4 years ago)

    EXISTING FAN COIL, ASSOCIATED DUCTWORK, AND PIPING TO BE ABANDONED IN SITE. EXISTING FAN COIL, ASSOCIATED DUCTWORK, AND PIPING TO BE ABANDONED IN SITE. EXISTING FAN COIL, ASSOCIATED DUCTWORK, AND PIPING TO BE ABANDONED IN SITE. EXISTING 3 TON CONDENSING UNIT (CU-2) ON ROOF TO BE REMOVED. INSULATE AND CAP CURB. NEW CASSETTE FAN COIL UNITS PLACED IN LOCATION OF EXISTING SUPPLY DIFFUSERS.

    From: Grand Junction (City)

  • C--Project 460-19-002 A/E - Replace Building 7 HVAC

    Type : Pre-Bid Notification

    Due : 05 Nov, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 09 Mar, 2020 (about 4 years ago)

    All equipment, piping, and ductwork that is found to be abandoned or is to be demolished shall be removed from the site. A/E to design and show all infection control / dust prevention measures required. A/E to assess and design any asbestos abatement such as pipe lagging, floor tile and mastic. A/E to provide necessary literature on new technology or installation methods when required.

    From: Federal Government (Federal)

  • Marina Restroom <b>Steam</b> Cleaning

    Marina Restroom Steam Cleaning

    Type : Bid Notification

    Due : 18 Apr, 2024 (Today)
    Posted : 17 days ago
    Started : 27 Mar, 2024 (22 days ago)

    The successful bidder will furnish all insurance, labor, materials, equipment, and supervision for the Monthly Steam Cleaning services.

    From: Santa Barbara (City)

  • Sunnyside High School Fire Alarm Replacement System with Revised Specifications

    Type : Bid Notification

    Due : 11 Feb, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 07 Jan, 2021 (about 3 years ago)

    \Mlere conduits extending through floors are to be abandoned, the Contractor shall cut and cap or plug conduit, so that it will not protrude above the floor. G. Where existing conduit is to be abandoned, the conduit shall be removed if it is exposed, in a crawl space or in an accessible ceiling. Where it is impossible to remove the conduit, it shall be cut off and capped or plugged. H.

    From: Sunnyside School (School)

  • REPLACE STEAM SYSTEM - AE DESIGN

    Type : Contract

    Due : 31 Mar, 2025 (in 11 months)
    Posted : about 3 years ago
    Started : 27 Jul, 2020 (about 3 years ago)

    REPLACE STEAM SYSTEM - AE DESIGN Solicitation ID/Procurement Identifier: 36C24419R0085 Ultimate Completion Date: Mon Mar 31 17:00:00 GMT 2025

    From: Federal Procurement Data System (Federal)