Search results for: access connection

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 1,294
  • Access Connection, Road Improvement

    Type : Bid Notification

    Due : 29 Nov, 2022 (17 months ago)
    Posted : 17 months ago
    Started : 14 Nov, 2022 (17 months ago)

    CowC23Da Invitation to Bid Sealed bids will be received by the Department of Game, Fish and Parks Engineering Section located at the Foss Building, 523 East Capitol Ave, Pierre, South Dakota 57501-3182 until 3:30 PM CT, Tuesday, Nov. 29, 2022 for labor and materials for Access Connection/Road Improvement, Cow Creek Recreation Area, Sully County, SD, GFP Project No. CowC23Da.

    From: South Dakota (State)

  • CO FLAP DEN 56(1) Access Connections to ROAR

    Type : Bid Notification

    Due : 23 Oct, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 23 Sep, 2019 (about 4 years ago)

    THIS IS AN INVITATION FOR BIDThe CO FLAP DEN 56(1) Access Connections to ROAR project is located in Adams County, Colorado, in the Rocky Mountain Arsenal National Wildlife Refuge.

    From: Federal Government (Federal)

  • CO FLAP DEN 56(1) Access Connections to ROAR

    Type : Bid Notification

    Due : 12 Jun, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 29 May, 2019 (about 4 years ago)

    A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs.PROJECT DETAILS: CO FLAP DEN56(1) Access Connections to ROAR The project is located in Adams County, Colorado, in the Rocky Mountain Arsenal National Wildlife Refuge. The project is a series of trails, pedestrian bridges and parking lots within the Refuge. 

    From: Federal Government (Federal)

  • SW, District, City of Fair Grove, Construction of sidewalk, access connections, culverts, and any incidental work related thereto, including stree...

    Type : Bid Notification

    Due : 29 Feb, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 01 Feb, 2024 (2 months ago)

    The proposed work generally includes the following: Construction of 5’ wide concrete sidewalk, access connections, culverts, and any incidental work related thereto, including street improvements within the project area in accordance with the plans and specifications. The project is generally located along the north side of W. Old Mill Rd. and along the east side of S.

    From: Missouri Department of Transportation (Transportation)

  • Dedicated Internet Access (DIA) Services , Riyadh, Saudi Arabia

    Type : Pre-Bid Notification

    Due : 03 May, 2024 (in 7 days)
    Posted : 20 days ago
    Started : 03 Apr, 2024 (22 days ago)

    The service provider will need to install and support a Dedicated Internet Access (DIA) connection to the United States (U.S.) Embassy located in the Diplomatic Quarter, Riyadh, KSA. The connection must provide connectivity from the demarcation point within the U.S. embassy compound, through the ISP central office and to the Internet. The demarcation point within the U.S. embassy compound must terminate in an Ethernet capable connection.

    From: Federal Government (Federal)

  • Apex Road at Palmer Blvd Roundabout

    Type : Bid Notification

    Due : 01 Jun, 2027 (in about 3 years)
    Posted : 14 months ago
    Started : 01 Oct, 2021 (about 2 years ago)

    The design shall include analysis of the existing stream, sediment management plan, erosion and bank stabilizations, trail ingress/egress access with a future connection of the Sarasota County Parks Trails Master Plan for a Natural Off- Road System connecting Woodmere Park to Venice East Blvd via the Alligator Creek Trail. Project Progress/Status The project was solicited as a Request for Professional Services (RPS) for Design.

    From: Sarasota County (County)

  • FAF-FY20-0304 - Prequalification for Design Build Contractor (DBC) for New Main Jail South

    Type : Bid Notification

    Due : 10 Apr, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 24 Mar, 2020 (about 4 years ago)

    The new facility will be located adjacent to, and with access connection to, the existing jail facilities.  The new facility will be constructed on existing County-owned land adjacent to existing correctional facilities that will remain operational during the design and construction of the new jail.  Interface with existing utilities and access will be required.  

    From: Santa Clara (County)