Search results for: access point and utm

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 9 of 9
  • Tender for Wireless Access Point and UTM Firewall

    Type : Bid Notification

    Due : 25 Jun, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 18 May, 2020 (about 4 years ago)

    Tender for Wireless Access Point and UTM Firewall Tender Value in ₹:- Should Allow NDA Tender:- No 

    From: Government of India (Federal)

  • ARMD ADVANCED AIR MOBILITY NATIONAL CAMPAIGN – 1 ANNOUNCEMENT OF COLLABORATIVE PARTNERSHIP OPPORTUNITIES

    Type : Bid Notification

    Due : 02 Apr, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 11 Mar, 2021 (about 3 years ago)

    The NC is inclusive of novel short take-off and landing  (STOL) and vertical take-off and landing (VTOL) vehicles to provide an order of magnitude increase in aviation access points to the general public with intended use cases of passenger carrying, as well as cargo and surveillance applications. 

    From: Federal Government (Federal)

  • Town Beach Erosion Mitigation & Improvement Project - RFP

    Type : Bid Notification

    Due : 03 Apr, 2023 (13 months ago)
    Posted : 12 months ago
    Started : 19 Mar, 2023 (13 months ago)

    The base of the wall will be approximately 2 feet above the NHWL elevation, and will be located approximately 18 feet from the NHWL at the closest point. The wall has been designed by a Professional Engineer consistent with manufacturer specifications.

    From: Casco (Town)

  • Fire Training Facility - Shed Foundation & Asphalt Pad

    Type : Bid Notification

    Due : 21 Apr, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 06 Apr, 2020 (about 4 years ago)

    Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: UTM Zone 12N NAD83 This product is generated from the USDA-NRCS certified data as of the version date(s) listed below.

    From: Grand Junction (City)

  • Riverfront at Dos Rios Phase II Construction

    Type : Bid Notification

    Due : 29 Jun, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 14 Jun, 2020 (about 3 years ago)

    The contractor shall coordinate with Buena Vida, LLC to ensure access to 535 Hale is maintained throughout construction. 3.4.

    From: Grand Junction (City)

  • Lunch Loop Trailhead Improvements

    Type : Bid Notification

    Due : 28 May, 2020 (about 3 years ago)
    Posted : about 4 years ago
    Started : 13 May, 2020 (about 4 years ago)

    The Contractor shall be responsible for any cost incurred by the Owner to provide access to the covered manholes or valve boxes. Final adjustment of all utility access points shall be completed within seven days of from the time the HMA was placed. Add the following new subsections: 401.23 Testing and Inspection The Contractor shall assume full responsibility for controlling all operations and processes to meet the Specifications.

    From: Grand Junction (City)