Search results for: adaptive traffic control network

Showing opportunity 1 - 4 of 4
  • Design Services of Adaptive Traffic Control Systems and Fiber Optic Network

    Type : Bid Notification

    Due : 07 May, 2024 (in 10 days)
    Posted : 7 days ago
    Started : 12 Apr, 2024 (14 days ago)

    Scope of Work: The Broward County Highway Construction and Engineering Division is seeking a qualified firm to prepare and provide Design Services of Adaptive Traffic Control Systems and Fiber Optic Network along Sheridan Street and Flamingo Road as described in the Scope of Work. The Project includes Pre-Design, Design, Permitting, and Procurement Phase Services. Refer to Scope of Work for particulars.

    From: Bridgeport (City)

  • Adaptive Traffic Control Systems (ATCS) on Hallandale Beach Blvd and US-1

    Type : Bid Notification

    Due : 02 May, 2024 (in 5 days)
    Posted : 7 days ago
    Started : 01 Apr, 2024 (25 days ago)

    Scope of Work: The Scope includes the furnishing of all labor, materials, equipment, services and incidentals required for the deployment of an Adaptive Traffic Control System (“ATCS”) and fiber optic network per Contract Documents for the Highway Construction and Engineering Division. The Project is located along two (2) roadway segments, per the Special Instructions for Vendors.

    From: Bridgeport (City)