Search results for: additional reservoir

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 46
  • 2017108 High System Additional Reservoir

    Type : Bid Notification

    Due : 24 Apr, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 14 Mar, 2023 (13 months ago)

    2017108 High System Additional Reservoir This project consists of the construction of composite elevated tank drinking water reservoir, approximately 800 linear feet of 30” water main, 1,500 square yards of 6-inch thick HMA pavement, sundry utility adjustments, and other related miscellaneous items. The City of Spokane will receive bids until 1:00 p.m.

    From: Ben Franklin Transit (Transportation)

  • 2017108 High System Additional Reservoir

    Type : Bid Notification

    Due : 24 Apr, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 15 Mar, 2023 (13 months ago)

    This project consists of the construction of composite elevated tank drinking water reservoir, approximately 800 linear feet of 30” water main, 1,500 square yards of 6-inch thick HMA pavement, sundry utility adjustments, and other related miscellaneous items. The City of Spokane will receive bids until 1:00 p.m.

    From: Washington State Office of Minority and Women (State)

  • Hillview Reservoir Chemical Additional Facilities

    Type : Contract

    Due : 08 Dec, 2023 (4 months ago)
    Posted : 5 months ago
    Started : 31 Oct, 2023 (5 months ago)

    Hillview Reservoir Chemical Additional Facilities Agency: New York State Contract Reporter Category:Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction Issue Date:10/31/2023 Due Date: 12/08/2023 Ad Type:Contractor Ads

    From: New York State Contract Reporter (City)

  • Val Vista Water Treatment Reservoir 3 Major Rehabilitation - Engineering Services - WS85050019

    Type : Bid Notification

    Due : 09 Feb, 2024 (2 months ago)
    Posted : 3 months ago
    Started : 05 Jan, 2024 (3 months ago)

    PROFESSIONAL Register Submit Response Additional Information The City of Phoenix is seeking a qualified consultant to provide Engineering Services for the rehabilitation of Val Vista Water Treatment Plant Reservoir 3, with additional improvements as required to take Reservoir 3 out of service during construction.

    From: Phenoix (City)

  • Improving Data Anomaly Detection and Forecasting in the US Army Corps of Engineers Reservoir Sedimentation Information (RSI) Database

    Type : Bid Notification

    Due : 26 Jul, 2023 (9 months ago)
    Posted : 11 months ago
    Started : 26 May, 2023 (11 months ago)

    In the current database, that includes 133 additional reservoirs. This number is expected to increase with the summer 2023 updates. Expanding the survey flagging process would specifically benefit data quality control for the RSI system. The additional flagging analysis will require quantifying reservoir pool elevations for capacity analysis and vertical datum correction factors for the 133+ additional USACE and USBR reservoirs.

    From: Ohio Department of Higher Education (Higher Education)

  • CLMP363 Southwest Pressure Zones Pump Station/Reservoir Stud

    Type : Bid Notification

    Due : 10 Dec, 2023 (4 months ago)
    Posted : 5 months ago
    Started : 25 Nov, 2023 (5 months ago)

    Type:Request For Qualifications (RFQS) Status: Open Solicitation Number:RFQS 6100 CLMP363 Description:CLMP363 Southwest Pressure Zones Pump Station/Reservoir Stud Summary:This Preliminary Engineering Report will research the effectiveness of an additional reservoir/pump station facility and related transmission in reducing reliance on Davis Lane Pump Station.

    From: Austin (City)

  • Slim Well - Geotechnical Investigation, F. E. Warren AFB, Wyoming

    Type : Bid Notification

    Due : 08 Dec, 2023 (4 months ago)
    Posted : 5 months ago
    Started : 17 Nov, 2023 (5 months ago)

    The project will also require a well test to evaluate critical resource parameters such as formation temperature, pressure, and productivity, along with evaluating reservoir fluid composition. Additional criteria for drilling, completions, and testing will be outlined in a forthcoming Request for Proposal.

    From: Federal Government (Federal)