Type : Bid Notification
Due : 15 May, 2024 (in 20 days)
Posted : 7 months ago
Started : 11 Apr, 2024 (13 days ago)
******************This Design-Bid-Build (DBB) construction project is to construct a corrosion control facility for painting large-bodied aircraft. An adequately sized and configured two Aircraft Corrosion Control Center to meet the KC-46 missions is required. The Aircraft Corrosion Control Center will include two hangar operations.