Search results for: airfield painting work

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 12
  • Airfield Painting Work Order

    Type : Bid Notification

    Due : 13 Dec, 2022 (16 months ago)
    Posted : 16 months ago
    Started : 08 Dec, 2022 (16 months ago)

    Work includes, but is not limited to, survey and layout of markings, painting and striping, thermoplastics, and related miscellaneous work. Contractor must be capable of applying 50,000 SF of paint within a 7-hour period. Addendum Description See Requirements – Section – Addenda for the latest Addendum to this solicitation. Suppliers must acknowledge all addenda before submittal of a bid or proposal.

    From: King County (County)

  • Airfield Painting Work Order

    Type : Bid Notification

    Due : 13 Dec, 2022 (16 months ago)
    Posted : 16 months ago
    Started : 06 Dec, 2022 (16 months ago)

    Work includes, but is not limited to, survey and layout of markings, painting and striping, thermoplastics, and related miscellaneous work. Contractor must be capable of applying 50,000 SF of paint within a 7-hour period. Addendum Description See Requirements – Section – Addenda for the latest Addendum to this solicitation. Attachments KC000716-Addendum-1.pdf (120.23 KB) KC000716-itb-documents.zip (33.18 MB)

    From: King County (County)

  • Maintain Airfield Markings

    Type : Pre-Bid Notification

    Due : 19 Apr, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 04 Apr, 2019 (about 5 years ago)

    Work will consist of painting of airfield markings. The work area will consist of approximately 304,000 SF of marking: 8,000 SF of red paint, 80,000 SF of black paint, 76,000 SF of yellow paint, and 142,000 SF of white paint. Additionally, approximately 33,000 SF of paint removal/obliteration. Surface preparation will be required before painting occurs. Some markings require removal/obliteration prior to repainting.

    From: Federal Government (Federal)

  • Maintain Airfield Markings

    Type : Bid Notification

    Due : 25 Mar, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 14 Mar, 2019 (about 5 years ago)

    The 366th Contracting Squadron at Mountain Home Force Base, Idaho, is seeking to identify potential sources qualified to perform the work involved in painting of airfield markings. The work area will consist of approximately 304,000 SF of marking: 8,000 SF of red paint, 80,000 SF of black paint, 76,000 SF of yellow paint, and 142,000 SF of white paint. Additionally, approximately 33,000 SF of paint removal/obliteration.

    From: Federal Government (Federal)

  • Airfield Maintenance IDIQ Sources Sought

    Type : Bid Notification

    Due : 20 Dec, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 20 Nov, 2018 (about 5 years ago)

    The potential scope of work primarily consists of crack repair, airfield painting, small depth maintenance, lighting, spall repair, roadway paving, and slab stabilization located at Joint Base San Antonio, Randolph AFB, Seguin Airfield, and Kelly Airfield. The requirement consists of a broad range of work to maintain, repair, and alter airfields throughout Joint Base San Antonio.

    From: Federal Government (Federal)

  • Little Rock AFB Airfield Pavements/Systems IDIQ

    Type : Bid Notification

    Due : 11 Dec, 2023 (4 months ago)
    Posted : 4 months ago
    Started : 01 Dec, 2023 (4 months ago)

    .- The contractor shall have a minimum of 5 years’ experience in the use of ultra-high pressure, low volume water blasting equipment for paint removal from airfield pavements.- The contractor shall have a minimum of 5 years’ experience in new and existing layout, preparation, and painting of airfields and roadways.The principal features of the work shall consist of but are not limited to the following:- Construction of new concrete pavements- Rubber

    From: Federal Government (Federal)

  • Airfield and Base Pavement IDIQ

    Type : Bid Notification

    Due : 03 Jan, 2024 (3 months ago)
    Posted : 5 months ago
    Started : 20 Dec, 2023 (4 months ago)

    ******Added 20 Dec 2023Historical data that provides a percentage of projects associated with the airfield verses road paving work. Rubber Removal 26%Parking Lots/Roads 23%Airfield Painting/Marking 18%Airfield Repair 15%Misc Airfield Repair 12%Misc Base Paving 6%*****UPDATE - Solicitation Amendment 0001 SF 1442 dated 12 Dec 2023 has been added to the attachment section.

    From: Federal Government (Federal)