Search results for: analyses for the evaluation

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 577
  • Benefits Methods Development and Other Relevant Analyses for the Evaluation of Air Pollution Control Policies

    Type : Bid Notification

    Due : 20 Jan, 2022 (about 2 years ago)
    Posted : about 3 years ago
    Started : 13 Jan, 2022 (about 2 years ago)

    The objective of this contract is to support the development of methods and analyses in support of regulatory and policy development or proposed congressional legislation.

    From: Federal Government (Federal)

  • VISN WIDE (VISN 05) Industrial Hygiene and Occupational Safety Assessment

    Type : Bid Notification

    Due : 10 May, 2024 (in 5 days)
    Posted : 23 days ago
    Started : 26 Apr, 2024 (8 days ago)

    To that end, VHA requires a comprehensive library of workplace industrial hygiene exposure assessments and occupational safety hazard risk assessments/job hazard analyses/evaluation which are separate from the Annual Workplace Evaluation and the Comprehensive Environment of Care rounds.

    From: Federal Government (Federal)

  • Program Management Services

    Type : Bid Notification

    Due : 19 Jul, 2023 (9 months ago)
    Posted : 9 months ago
    Started : 12 Jul, 2023 (9 months ago)

    dashboard development and maintenance; and (5) monitoring and evaluation services to analyze data, track outcomes, and continuously support improvements to EAC’s evaluation processes.

    From: Federal Government (Federal)

  • Teslin River and Lewes River Bridges Project: Strategic Engineering & Comprehensive Structural Analysis on Alaska Highway #1, km 1295 and km 1393

    Type : Bid Notification

    Due : 14 Aug, 2023 (8 months ago)
    Posted : 8 months ago
    Started : 12 Jul, 2023 (9 months ago)

    The tasks to be conducted on the Teslin River and Lewes River Bridges involve comprehensive structural evaluations and specific inspections respectively. For the Teslin River Bridge, scope of work involves a complete condition assessment, inclusive of a thorough field and underwater inspection, engineering analyses, maintenance needs evaluation, and a Life Cycle Cost Analysis.

    From: Canada (Federal)

  • W9113M16C0004 / Simulation Center Extension J&A

    Type : Bid Notification

    Due : 24 Feb, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 09 Feb, 2022 (about 2 years ago)

    The SimCtr is a consolidated Government Owned/Contractor Operated (GO/CO) facility located on Redstone Arsenal, Alabama that supports USASMDC and Missile Defense Agency (MDA) mission essential modeling and simulation, analyses, test and evaluation (T&E), and experimentation requirements. 

    From: Federal Government (Federal)

  • Teslin River and Lewes River Bridges Project: Strategic Engineering & Comprehensive Structural Analysis on Alaska Highway #1, km 1295 and km 1393

    Type : Bid Notification

    Due : 14 Aug, 2023 (8 months ago)
    Posted : 9 months ago
    Started : 19 Jul, 2023 (9 months ago)

    For the Teslin River Bridge, scope of work involves a complete condition assessment, inclusive of a thorough field and underwater inspection, engineering analyses, maintenance needs evaluation, and a Life Cycle Cost Analysis.

    From: Yukon-Koyukuk Census Area (City)

  • Educational Consulting, Professional Development, and Other Student-Based Contracted Services

    Type : Bid Notification

    Due : 28 Apr, 2028 (in about 4 years)
    Posted : about 2 years ago
    Started : 28 Jan, 2021 (about 3 years ago)

    These services may consist of information, advice, opinions, alternatives, conclusions, recommendations, demonstrations, or direct assistance, such as studies, analyses, evaluations, performances, education, and liaison. It is the intent of the District to select the first group of vendor(s) for award at the April 2021 Board meeting to multiple successful vendors.

    From: Waco Independent School District (Higher Education)