Search results for: arc additive manufacturing

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 24
  • WIRE ARC ADDITIVE MANUFACTURING OF NON GRAVITY ALIGNED ALUMINUM STRUCTURES

    Type : Contract

    Due : 31 Jan, 2025 (in 9 months)
    Posted : 2 months ago
    Started : 13 Feb, 2024 (2 months ago)

    WIRE ARC ADDITIVE MANUFACTURING OF NON GRAVITY ALIGNED ALUMINUM STRUCTURES Solicitation ID/Procurement Identifier: 80NSSC23M0039 Ultimate Completion Date: Fri Jan 31 18:00:00 GMT 2025

    From: Federal Procurement Data System (Federal)

  • Wire Arc Additive Manufacturing

    Type : Bid Notification

    Due : 05 Apr, 2024 (13 days ago)
    Posted : 1 month ago
    Started : 07 Mar, 2024 (1 month ago)

    This document describes a metal Additive Manufacturing (AM) system for the Metal Workingand Machining Shop Set (MWMSS). The MWMSS is an assemblage of machinists cutting,measuring, and welding equipment integrated into two one side expandable 8’x8’x20’ mobileshelters. The MWMSS was designed to support the Military Occupational Specialty (MOS) 91Ethat combined the previous 44E (Machinist) and 44B (Metalworker/Welder).

    From: Federal Government (Federal)

  • Wire Arc Additive Manufacturing for Aircraft Components

    Type : Award

    Due : 29 Jul, 2022 (20 months ago)
    Posted : 21 months ago
    Started : 14 Jul, 2022 (21 months ago)

    It is for the Strategic Environmental Research and Development Program (SERDP) entitled, Wire Arc Additive Manufacturing for Aircraft Components.  The period of performance is 24 months.

    From: Federal Government (Federal)

  • MINES22068 Wire-Arc Additive Manufacturing Machine DQ

    Type : Bid Notification

    Due : 13 Jun, 2022 (22 months ago)
    Posted : 23 months ago
    Started : 26 May, 2022 (23 months ago)

    Mines requires an integrated wire-arc additive manufacturing (“WAAM”) machine capable in support of a project exploring metal additive manufacturing for fabricating structural components for the US defense community.  Equipment shall be delivered on a “FOB Destination, prepay and add” basis. ...

    From: Colorado School of Mines (School)

  • Wire Arc Additive Manufacturing Platform

    Type : Bid Notification

    Due : N/A
    Posted : about 3 years ago
    Started : 10 Mar, 2021 (about 3 years ago)

    See more details...

    From: Campbell River (City)

  • ITB #2019-09 OMIC Wire Feed and Arc Welder Additive Manufacturing System

    Type : Bid Notification

    Due : 15 Mar, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 29 Feb, 2020 (about 4 years ago)

    Oregon Public Universities Business and Bid Opportunities Login (Campus Only) Print Opportunity ITB #2019-09 OMIC Wire Feed and Arc Welder Additive Manufacturing System This opportunity is closed Description Award Notice for ITB #2019-09 OMIC Wire Feed and Arc Welder Additive Manufacturing System.

    From: Oregon Public Universities (State)

  • Wire Arc Additive Manufactured (WAAM) Parts

    Type : Bid Notification

    Due : 05 Aug, 2022 (20 months ago)
    Posted : 21 months ago
    Started : 27 Jul, 2022 (21 months ago)

    and high strength steel systemsParts will range in size from 6”x6”x6” up to 5’x5’x5’Parts must be manufactured using the wire arc additive manufacturing (WAAM) processThe ERDC intends to issue a master Blanket Purchase Agreement (BPA) to Lincoln Electric Company (Cage Code: 8RAH3) on a sole source basis.

    From: Federal Government (Federal)