Type : Bid Notification
The analysis is to include but not limited to a short-circuit analysis with protective device evaluation and arc flash calculations and a protective device coordination study. Coordination study should make recommendations for best overcurrent protection selectivity that is possible using the existing devices. This is a request for proposal (RFP) against Supply Arrangement (SA) E0225-150564 Electrical Engineering Services.