Search results for: arch-replace visitor center roof

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 51
  • ARCH-REPLACE VISITOR CENTER ROOF

    Type : Contract

    Due : 01 Sep, 2023 (8 months ago)
    Posted : 16 months ago
    Started : 23 Dec, 2022 (16 months ago)

    ARCH-REPLACE VISITOR CENTER ROOF Solicitation ID/Procurement Identifier: 140P1220D0007 Ultimate Completion Date: Fri Sep 01 17:00:00 GMT 2023

    From: Federal Procurement Data System (Federal)

  • ARCH-REPLACE HEAT PUMPS

    Type : Contract

    Due : 31 May, 2021 (about 2 years ago)
    Posted : about 3 years ago
    Started : 02 Mar, 2021 (about 3 years ago)

    ARCH-REPLACE HEAT PUMPS Solicitation ID/Procurement Identifier: 140P1221Q0020 Ultimate Completion Date: Mon May 31 17:00:00 GMT 2021

    From: Federal Procurement Data System (Federal)

  • Manchester CULVERT REPLACEMENTS – BENTLEY HILL ROAD AND ROOTVILLE ROAD, CONTRACT 2023-2

    Type : Bid Notification

    Due : 13 Apr, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 16 Mar, 2023 (13 months ago)

    The Project includes the following Work: Replace an existing 5-foot diameter CMP culvert with a new 8-foot high and 14-foot wide precast concrete box culvert, including water main relocation; replace an existing 24-inch HDPE culvert with a new 64-inch span and 43-inch rise aluminum pipe arch culvert; replace an existing 18-inch HDPE culvert with a new 24-inch HDPE culvert, including a new precast concrete headwall; and gravel road restoration..

    From: Vermont (State)

  • EN24474046 Supply and Installation of Major Culvert N5-264 Halfway River South Forest Service Road

    Type : Bid Notification

    Due : 05 Mar, 2024 (2 months ago)
    Posted : 2 months ago
    Started : 13 Feb, 2024 (2 months ago)

    Summary DetailsSupply and installation of a 3.65m x 2.28m mx 18.0m CMP Arch Pipe that replace two existing 1000mm CMP Pipe. This will include installing a flexible 900mm diversion pipe during construction. The pipes are to be purchased and invoiced prior to March 31, 2024. Installation is to occur after September 15, 2024. The road will be closed for the duration of the installation. Official Contact Details :- Official Contact Details

    From: British Columbia (State)

  • Crane Strand Canal Culvert Replacement (Border Canal)

    Type : Bid Notification

    Due : 22 Feb, 2023 (14 months ago)
    Posted : 15 months ago
    Started : 20 Jan, 2023 (15 months ago)

    BackgroundCrane Strand Culvert Replacement (Border Canal)Scope of ServicesThe proposed drainage maintenance improvements will include the following elements within the Seminole County 50-ft wide drainage easement:• Remove approximately 1,425 linear feet of 65-inch x 40-inch corrugated metalpipe arch (CMPA) and replace with double 48-inch reinforced concrete pipe (RCP).• Remove and replace the existing concrete headwall located at the upstream end

    From: Seminole (County)

  • REPLACE UNDERLAYMENT, REPLACE SHINGLES WITH ARCH SHINGLES, AND REPLACE SKYLIGHT WITH 3/4 INCH PLYWOOD.

    Type : Contract

    Due : 02 Jul, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 02 Jun, 2020 (about 3 years ago)

    REPLACE UNDERLAYMENT, REPLACE SHINGLES WITH ARCH SHINGLES, AND REPLACE SKYLIGHT WITH 3/4 INCH PLYWOOD. Solicitation ID/Procurement Identifier: 12447U20P0060 Ultimate Completion Date: Thu Jul 02 17:00:00 GMT 2020

    From: Federal Procurement Data System (Federal)

  • Replace existing roof.

    Type : Bid Notification

    Due : 21 May, 2024 (in 16 days)
    Posted : 14 hours ago
    Started : 29 Apr, 2024 (5 days ago)

    03-Nev-80-R5.5/R5.8 *** NEVADA COUNTY APPROXIMATELY 12.4 MILES WEST OF TRUCKEE AT DONNER SUMMIT SAFETY ROADSIDE REST AREA

    From: California (State)