Search results for: artwork phase

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 13
  • Request for Qualifications Nickel Plate Trail Tunnel Artwork Phase 1

    Type : Bid Notification

    Due : 19 Aug, 2022 (20 months ago)
    Posted : 22 months ago
    Started : 27 Jun, 2022 (22 months ago)

    Project OverviewThe Fishers Arts & Culture Commission (FACC) with the City of Fishers (City) seeks an artist, artist team, or creative company to be begin the visual transformation of the newly open Nickel Plate Trail tunnel under E 116th Street. Three locations have been chosen as part of this phased project, shown below, to transform with a mural. The murals should be vibrant in color and allow for an “Instagrammable” moment while also helping establish a sense of place. Wall A: Plaza Tunnel West and Wall B: Plaza Tunnel East are identical at 194 sqft each and can be submitted as one proposal or separately. Wall C: Plaza Stairs is a unique wall at 390 sqft that flanks one of two stairs between the tunnel and the surface level. BudgetThe B...

    From: Fishers (City)

  • The San Antonio River Authority

    Type : Bid Notification

    Due : 30 Mar, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 09 Feb, 2022 (about 2 years ago)

    The San Antonio River Authority (River Authority), in partnership with Bexar County, seeks to commission a large-scale, functional artwork for the third phase of San Pedro Creek Culture Park (Culture Park) which is currently under construction. The artwork must provide (and demonstrate) water quality improvements, one of the main goals of Culture Park, by capturing run off from the Interstate 35 bridge overpass.

    From: Utah Division Of Arts And Museums (State)

  • Furnish and Install Wrap for Traffic Control Boxes

    Type : Bid Notification

    Due : 11 Sep, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 05 Aug, 2019 (about 4 years ago)

    I with printed adhesive vinyl with artwork provided by the City.

    From: Sunrise (City)

  • Norco Monument Flatwork & Walls

    Type : Bid Notification

    Due : 21 Apr, 2023 (12 months ago)
    Posted : 12 months ago
    Started : 14 Apr, 2023 (12 months ago)

    This project will be broken into 3 phases; Flatwork/Walls, Artwork, and Landscape. This project listed is ONLY for the flatwork and walls of the project that consists of: 1. Installation of 130 LF of pony wall with decorative finish 2. Installation of 700 SF of brick pavers 3. Installation of ADA built in bench 4. 85 SF 1’ concrete band Special Notices Place eBid

    From: Norco (City)

  • REQUEST FOR PROPOSAL: TOWN CENTER DONOR RECOGNITION WALL DESIGN AND INSTALLATION

    Type : Bid Notification

    Due : 25 Jun, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 20 Apr, 2021 (about 3 years ago)

    Draft Project Schedule (See Detailed Project Schedule in Contract) Start Date – Upon receipt of Notice to Proceed from the Town Phase 1 – Preliminary Design Approval (~July 8 - August 16, 2021) Phase 2 – Fabrication of Artwork (~August 16 - September 30, 2021) Phase 3 – Installation of Artwork (September 30 – October 30, 2021) Art work Contract Attached to the RFP (Exhibit C) is a copy of the Town’s Contract to Purchase Artwork

    From: Atherton (Town)

  • CT AIDS Memorial

    Type : Bid Notification

    Due : 31 Dec, 2023 (3 months ago)
    Posted : 6 months ago
    Started : 16 Dec, 2023 (4 months ago)

    Artists/teams have approximately 4 weeks to prepare and submit preliminary concepts, including the presentations for Phase 3. Phase 3 | The Selection Committee will select the finalist.

    From: Utah Division of Arts And Museums (State)

  • Hidden Trails Park Public Art Project

    Type : Bid Notification

    Due : 19 Dec, 2022 (16 months ago)
    Posted : 17 months ago
    Started : 17 Nov, 2022 (17 months ago)

    During the design phase, the specific location for incorporating artwork into the park will be identified through a collaborative exploration between the project design team and Artist. The Artist will design, fabricate, transport the artwork, and consult during installation of artwork on a timeline that parallels the park project schedule. Notes Special Notices Local Programs & Policies Place eBid

    From: San Diego (City)