Type : Bid Notification
The County of Riverside Transportation and Land Management Agency (TLMA) is soliciting quotations for Asbestos Sampling and AQMD Asbestos Survey Report Services as detailed in this RFQ.
The County of Riverside Transportation and Land Management Agency (TLMA) is soliciting quotations for Asbestos Sampling and AQMD Asbestos Survey Report Services as detailed in this RFQ.
Survey Report Form Dec 2023.pdf 1,199,239 3.6 HAZMAT Reports/2024 SEC Renovation ACM Survey Report 022924.pdf 4,894,815 3.8 As-Builts/2019 Re-Roof/North Roof Drainage As-builts.pdf 126,074 3.8 As-Builts/10 ton & 3 ton rooftop units with roof mod/Mechanical Permit 22-122711-FA.pdf 127,106 3.8 As-Builts/2019 Re-Roof/As Built for NW + NE + SW + SE final added tapered insulation S2.1 roof....pdf 495,944 3.8 As-Builts/10 ton & 3 ton rooftop units with
SPECIAL INSTRUCTIONS FOR RESIDENTIAL AND LIGHT COMMERCIAL DEMOLITIONS. 91240-026.0 Pre-Bid Meeting Attendance (PDF, 74KB) 91240-026.0 Bid Document (PDF, 3MB) 91240-026.0 Distribution List (PDF, 69KB) 91240-026.0 Asbestos Survey 1344 E Main (PDF, 3MB) VIRTUAL PRE-BID MEETING/INSPECTION on April 4, 2024 @ 9:00 a.m. Local Time Then proceed to project sites at your own pace, open until 4:00 p.m.
Harmon Asbestos and Lead Survey Report.pdf Asbestos and lead survey report 7.46 MB Exhibit D - CAM 2305 Schedule of Values.xlsx Schedule of Values 10 KB Exhibit E - CAM 2305 Bid Walk Location Map.pdf Site Walk map 881 KB
\n\nProject Objective\n\nWe understand this asbestos survey was requested due to the planned demolition of\nthe building. EPA regulation 40 CFR 61, Subpart M, National Emission Standards for\nHazardous Air Pollutants (NESHAP), prohibits the release of asbestos fibers to the\natmosphere during demolition or renovation activities.
ASBESTOS SURVEY, AND ABATEMENT HAVE BEEN COMPLETED PRIOR TO DEMOLITION BID. Demolition $s (Contractors Name) (Street Address) Plumbing Cost $. Total S.
The Town of Milton will file the municipal demolition permit for the project, and the Town of Milton will provide the asbestos survey for the buildings to the selected demolition contractor.A mandatory pre-bid meeting will be held on Thursday, April 18 at 1 p.m. at the site.