Search results for: asf project

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 22
  • ATTN LINDA WASHINGTON HPAI ORDER FOR HPAI, AND ASF PROJECT

    Type : Contract

    Due : 03 Sep, 2022 (20 months ago)
    Posted : about 2 years ago
    Started : 04 May, 2022 (about 2 years ago)

    ATTN LINDA WASHINGTON HPAI ORDER FOR HPAI, AND ASF PROJECT Solicitation ID/Procurement Identifier: 12639522Q0146 Ultimate Completion Date: Sat Sep 03 17:00:00 GMT 2022

    From: Federal Procurement Data System (Federal)

  • B104 Lab Renovation, CVM Main Building

    Type : Bid Notification

    Due : 30 Jun, 2017 (about 6 years ago)
    Posted : about 7 years ago
    Started : 02 Jun, 2017 (about 7 years ago)

     One-Two Sentences This project will program and renovate 7,700 ASF of lab space in the B104 suite in the College of Veterinary Medicine (CVM) Main Building (1982).

    From: North Carolina University (Higher Education)

  • COLLABORATIVE DESIGN-BUILD SERVICES FOR BRAWLEY CAMPUS LITHIUM RESEARCH HUB/STEM BUILDING

    Type : Bid Notification

    Due : 09 Aug, 2022 (20 months ago)
    Posted : 22 months ago
    Started : 29 Jun, 2022 (22 months ago)

    The Project approximately consists of: The project will construct new standalone laboratory/lecture/research building to be named the IVC Brawley ¿ Lithium Research Hub / STEM Building (Academic Building II #102) located on a vacant development site on the IVC Brawley master plan. This project will provide a 43,000 ASF/66,000 GSF STEM research and instructional facility.

    From: California (State)

  • Brawley Campus Lithium Research HUB / STEM Building

    Type : Bid Notification

    Due : 09 Aug, 2022 (20 months ago)
    Posted : 22 months ago
    Started : 27 Jun, 2022 (22 months ago)

    The Project approximately consists of: The project will construct new standalone laboratory/lecture/research building to be named the IVC Brawley – Lithium Research Hub / STEM Building (Academic Building II #102) located on a vacant development site on the IVC Brawley master plan. This project will provide a 43,000 ASF/66,000 GSF STEM research and instructional facility.

    From: San Diego State University (Higher Education)

  • North Life Sciences Replacement Project

    Type : Bid Notification

    Due : 20 Jul, 2023 (9 months ago)
    Posted : 10 months ago
    Started : 16 Jun, 2023 (10 months ago)

    Other Details The Project approximately consists of: The project will construct a new laboratory/lecture/research building to be named the New North Life Sciences Building located on a hillside site location on the main campus. This project will provide a 38,000 ASF/67,000 GSF STEM research and instructional facility.

    From: San Diego State University (Higher Education)

  • Army Reserve Center/Aviation Support Facility, MacDill AFB, FL

    Type : Pre-Bid Notification

    Due : 28 Jul, 2017 (about 6 years ago)
    Posted : about 7 years ago
    Started : 27 Jun, 2017 (about 6 years ago)

    Formal LEED GBCI certification is required for the ARC-ASF. The Base work also includes the demolition of an existing skeet/trap range and construction of a new skeet range with overlapping grenade range targets on a nearby site. The site of the new ranges is approximately one (1) mile from the site of the ARC-ASF.

    From: Federal Government (Federal)

  • Optometry Clinic Building

    Type : Bid Notification

    Due : 22 Nov, 2017 (about 6 years ago)
    Posted : about 6 years ago
    Started : 09 Nov, 2017 (about 6 years ago)

    The preliminary program totals about 60,000 ASF (Assignable Square Feet) and 93,000 GSF (Gross Square Feet) on five floors. The preliminary program elements include: Office: 32,000 ASF Optometry Clinic: 25,000 ASF Eyewear Gallery: 3,000 ASF Other retail: 3,500 ASF Building The project will require demolition of existing buildings totaling 14,000 GSF, and construction on a constrained site of a 5-story office and clinic building.

    From: Ohio Facilities Construction Commission (State)