Search results for: asphalt repairs and rehabilitation

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 546
  • Asphalt Repairs and Rehabilitation, Part A - County Roads

    Type : Bid Notification

    Due : 11 Apr, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 15 Mar, 2023 (13 months ago)

    Bid Classification: Construction Bid Type: RFT (Request for Tender) Bid Number: PW-2023-13A Bid Name: Asphalt Repairs and Rehabilitation, Part A - County Roads Bid Status: Open Published Date: Wed Mar 15, 2023 9:00:00 AM (EDT) Bid Closing Date: Tue Apr 11, 2023 3:00:00 PM (EDT) Question Deadline: Tue Apr 4, 2023 3:00:00 PM (EDT) Electronic Auctions: Not Applicable Language for Bid Submissions: English unless specified in the bid document Submission

    From: Leeds and Grenville (County)

  • - Asphalt Repairs and Rehabilitation, Part A - County Roads

    Type : Bid Notification

    Due : 11 Apr, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 16 Mar, 2023 (13 months ago)

    Project Description :

    From: MerX (Federal)

  • Miami County, IN INDOT Rehabilitation & Asphalt Repair Project information

    Type : Bid Notification

    Due : 15 Sep, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 19 Aug, 2021 (about 2 years ago)

    Miami County, IN INDOT Rehabilitation & Asphalt Repair Project information 9/15/21 Phend & Brown, Inc. See Project information

    From: Indiana (State)

  • FB 21-388: North GA Apron Rehabilitation & Asphalt Repair

    Type : Bid Notification

    Due : 04 Aug, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 14 Jul, 2021 (about 2 years ago)

    Bid Details Planholder FB 21-388: North GA Apron Rehabilitation & Asphalt Repair Active Download Bid Package Bid Details Agency Name City of Boise Bid Writer Missy Grothaus Bid ID FB-FB 21-388-0-2021/mmg Bid Type FB - Formal Bid Broadcast Date 07/14/2021 9:30 AM Mountain Fiscal Year 2021 Due Date 08/04/2021 10:00 AM Mountain Bid Status Text None Scope of Work Work includes asphalt removal, excavation, subbase course, base course, hot mix asphalt

    From: Boise (City)

  • 2023 Archibald St Pavement Rehabilitation and Water Main Renewal - (Contract 2)

    Type : Bid Notification

    Due : 31 Mar, 2023 (13 months ago)
    Posted : 13 months ago
    Started : 16 Mar, 2023 (13 months ago)

    D3.2 The major components of the Work are as follows: (a) Pavement Rehabilitation (i) Construction of temporary detour pavement; (ii) Planing of existing asphalt overlay; (iii) Full depth concrete repairs of existing slabs and joints (200 mm reinforced concrete pavement); (iv) Construction of new 200 mm reinforced concrete pavement; (v) Installation of catch basins, catch pits and connection pipe; (vi) Replacement of catch basin connection pipe; (

    From: MerX (Federal)

  • Rough Fire Asphalt Rehabilitation

    Type : Bid Notification

    Due : 07 Jun, 2017 (about 7 years ago)
    Posted : about 7 years ago
    Started : 17 May, 2017 (about 7 years ago)

    Added: Mar 02, 2017 5:01 pm Modified: May 17, 2017 8:13 pm Track Changes This project proposes to perform asphalt pavement repairs using hot mix asphalt pavement on four (4) roads for a total length of 11.4 miles. The roads are located within or adjacent to the Rough Fire area which burned from August - September 2015. Amendment No. 1 see attachments

    From: Federal Government (Federal)

  • Rough Fire Asphalt Rehabilitation

    Type : Bid Notification

    Due : 07 Jun, 2017 (about 7 years ago)
    Posted : about 7 years ago
    Started : 17 May, 2017 (about 7 years ago)

    This project proposes to perform asphalt pavement repairs using hot mix asphalt pavement on four (4) roads for a total length of 11.4 miles. The roads are located within or adjacent to the Rough Fire area which burned from August - September 2015.Amendment No. 1 see attachmentsContact Information: Patrick J.

    From: Federal Government (Federal)