The Work includes but is not limited to all labor, equipment, and materials for the construction of the following: Asphalt parking lot resurfacing / striping Asphalt trail resurfacing Various drainage improvements Concrete curb and gutter (repair / new) Concrete flatwork (sidewalk, vehicular ramp / parking stalls, pads) Site restoration (topsoil / seeding)
Bid Details Planholder Fox River Trail Asphalt Resurfacing Design Active Browse Awarded Bids Download Bid Package Bid Details Agency Name Brown County Purchasing Bid Writer Dale DeNamur Bid ID RFQ-2601A-0-2023/DD Bid Type RFQ - Request for Quote Broadcast Date 09/13/2023 11:13 AM Central Fiscal Year 2023 Due Date 10/03/2023 3:00 PM Central Bid Status Text None Additional Registration (NEW) NONE Broadcast List Filtered State Wisconsin City Self Declaration
Bid Title:Cedar Valley Natue Trail Structures and Paving, Division 2 Category:County Conservation BoardStatus:OpenBid Recipient:Black Hawk County Conservation Description: The extent of the work involved consists of construction of a 3-span slab trail bridge, a prefabricated truss trail bridge, and a concrete beam trail bridge. Asphalt resurfacing of trail segments, asphalt paving of three trail roadway crossings.
Project will include approximately 135 LF of new asphalt trail and 115 LF of existing asphalt trail resurfacing. Ash tree removal and boardwalk lighting is also included. Project also includes removal of a 67-foot-long boardwalk near Town Center Park and replacement with a 71-foot long timber boardwalk on helical piles with composite decking.
Solicitation Details:TitleP-012-222-010 Asphalt Resurfacing Project - Western Maryland Rail Trail @ DNR Fort Frederick State ParkIDBPM040664Alternate IDLot #1Round #2StatusOpen[imp]OpenClosedResponses OpenedApprovedDraftDue / Close Date (EST)Due / Close Date (EST)Solicitation TypeIFB: Invitation for BidPublic NoticePORFPRequest for Information & PricingRequest for InformationRequest for QuoteTechnical Envelope (Multi-Step)RFR - CATS SpecificFinancial
Bids are invited upon the several items and quantities of work as follows: Construction of approximately 2,300 L.F. of 10’ wide new asphalt trail, and resurfacing of 3,600 L.F. of 10’ wide existing asphalt trail. This project includes Clearing and Grubbing, Grading (.5 Acres), Stone Base Setup (850 Tons), and Asphalt Surface (900Tons).