Search results for: auxiliary chamber downstream

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 11
  • 56-Ft Wide Auxiliary Chamber Downstream Closure Retrofit – Coffer Beam for Montgomery Locks and Dam Synopsis

    Type : Pre-Bid Notification

    Due : 31 May, 2022 (23 months ago)
    Posted : about 2 years ago
    Started : 15 Apr, 2022 (about 2 years ago)

    Army Corps of Engineers, Pittsburgh District, has a requirement for a new auxiliary chamber downstream closure system at Montgomery Locks and Dam, Ohio River, Monaca, Bever County, Pennsylvania. The major features of the requirement are identified below:The contract is a fabrication supply contract including furnishing and delivering a complete coffer beam assembly.

    From: Federal Government (Federal)

  • 56-Ft Wide Auxiliary Chamber Downstream Closure Retrofit ? Coffer Beam for Montgomery Locks and Dam

    Type : Bid Notification

    Due : 14 Jul, 2022 (21 months ago)
    Posted : 23 months ago
    Started : 30 Jun, 2022 (22 months ago)

    Cancel the Invitation For Bid (IFB) in accordance w ith FAR Subpart 14.404-1(c)(8). The IFB is being converted to a Request for Proposal (RFP) in accordance w ith FAR 14.404(e)(1).

    From: Federal Government (Federal)

  • Hydraulic System Replacement, Pike Island Locks and Dam

    Type : Bid Notification

    Due : 15 Dec, 2022 (16 months ago)
    Posted : 18 months ago
    Started : 15 Dec, 2022 (16 months ago)

    Two (2) HPUs on the river wall; one upstream and one downstream for operation of the Main Chamber culvert valves and miter gates. ?Two (2) HPUs on the middle wall; one upstream and one downstream for operation of Main Chamber culvert valves and miter gates. In addition, the two HPUs on the middle wall are for operation of the Auxiliary Chamber miter gates.

    From: Federal Government (Federal)

  • Melvin Price Lock & Dam Main Lock Lift Gate Install & Machinery Replacement - USACE St. Louis District

    Type : Bid Notification

    Due : 31 Oct, 2022 (18 months ago)
    Posted : 20 months ago
    Started : 05 Oct, 2022 (19 months ago)

    The project consists of a main lock and an auxiliary lock; a dam containing nine Tainter gates; and a fixed submersible dike reaching the Missouri Side of the River.  The main lock is 1200 ft by 110 ft with a lift gate at the upstream end and a miter gate at the downstream end of the lock chamber

    From: Federal Government (Federal)

  • Melvin Price Locks and Dam Lift Gate Install and Machinery Replacement Project

    Type : Bid Notification

    Due : 23 Mar, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 09 Mar, 2022 (about 2 years ago)

    The project consists of a main lock and an auxiliary lock; a dam containing nine Tainter gates; and a fixed submersible dike reaching the Missouri Side of the River.  The main lock is 1200 ft by 110 ft with a lift gate at the upstream end and a miter gate at the downstream end of the lock chamber

    From: Federal Government (Federal)

  • Melvin Price Locks & Dam Direct Acting Cylinder Installation, Lock Wall Grating Replacement, and Handrail Anchorage Connection Rehabilitation Project

    Type : Bid Notification

    Due : 05 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 07 Feb, 2024 (2 months ago)

    The project consists of a main lock and an auxiliary lock; a dam containing nine Tainter gates; and a fixed submersible dike reaching the Missouri Side of the River. The main lock is 1200 ft by 110 ft with a lift gate at the upstream end and a miter gate at the downstream end of the lock chamber.

    From: Federal Government (Federal)

  • Mel Price Lock & Dam Lift Gate Install & Machinery Replacement

    Type : Bid Notification

    Due : 25 May, 2023 (11 months ago)
    Posted : 14 months ago
    Started : 25 Apr, 2023 (12 months ago)

    The project consists of a main lock and an auxiliary lock; a dam containing nine Tainter gates; and a fixed submersible dike reaching the Missouri Side of the River. The main lock is 1200 ft by 110 ft with a lift gate at the upstream end and a miter gate at the downstream end of the lock chamber.

    From: Federal Government (Federal)