Search results for: ave intersection improvement

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 240
  • Wellesley Ave @ Great Plain Ave Intersection Improvement Project

    Type : Bid Notification

    Due : 18 Jun, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 27 May, 2020 (about 3 years ago)

    Wellesley Ave @ Great Plain Ave Intersection Improvement Project Category:Other Construction Projects The work includes unclassified excavation, full depth hot mix asphalt pavement, resetting of granite curb, cement concrete wheelchair ramps, hot mix asphalt sidewalks and driveways, modification to the closed drainage system, pavement markings, signs, street lighting and other incidental work items included in the contract documents. 

    From: Wellesley (Town)

  • E. Main St./Williamsburg Ave. Intersection Improvements

    Type : Bid Notification

    Due : 28 May, 2024 (in 1 month)
    Posted : 8 days ago
    Started : 17 Apr, 2024 (10 days ago)

    The City of Richmond is accepting bids for the construction of theE. Main St./Williamsburg Ave. Intersection Improvements project to provide general contracting services that include but are not limited to:Installation of a signalization and roadway lightingInstallation of new concrete curb, sidewalks, curb ramps, and pedestrian signalsInstallation of new ADA-accessible curb rampsInstallation of traffic signs, markings, and crosswalksExcavation and removal of existing concrete, earth, pavement, and other itemsConstruction of asphalt pavementInstallation of a 14’ wide medianInstallation of storm water drainageErosion and sediment control, including topsoil and permanent seedingMaintenance of trafficMobilizationAny other miscellaneous ...

    From: Richmond (City)

  • IFB 240008789 E. Main St./Williamsburg Ave. Intersection Improvements

    Type : Bid Notification

    Due : 28 May, 2024 (in 1 month)
    Posted : 8 days ago
    Started : 18 Apr, 2024 (8 days ago)

    The curve at Libby Hill Park will be improved to accommodate a design speed of 25 mph, and a new signal will be installed at the intersection. The intersection improvements will also include pedestrian facilities, as well as landscaping. Sidewalks will be constructed on both sides of the intersection.

    From: Virginia (State)

  • CAMPBELL AVE AND SPRING AVE INTERSECTION IMPROVEMENTS

    Type : Bid Notification

    Due : 13 Nov, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 21 Oct, 2019 (about 4 years ago)

    Category:Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction Issue Date:10/21/2019 Due Date:11/13/2019 Ad Type:Contractor Ads

    From: New York State Contract Reporter (City)

  • Campbell Ave and Spring Ave Intersection Improvements

    Type : Bid Notification

    Due : 13 Nov, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 15 Oct, 2019 (about 4 years ago)

    Agency:Troy, City of Category:Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction Issue Date:10/15/2019 Due Date:11/13/2019 Ad Type:General

    From: New York State Contract Reporter (City)

  • Fowler Ave & Olive Ave Intersection Improvements

    Type : Bid Notification

    Due : 08 Feb, 2024 (2 months ago)
    Posted : 3 months ago
    Started : 11 Jan, 2024 (3 months ago)

    23-04-C Fowler Ave & Olive Ave Intersection Improvements The work to be done consists, in general, of installing a new traffic signal, reconstructing the pavement, and widening the intersection of Fowler Avenue and Olive Avenue. The work will also include signing, striping, and pavement marking. Two new drain inlets with storm drain pipe are included as part of the work.

    From: Fresno (County)

  • Fowler Ave & Olive Ave Intersection Improvements

    Type : Bid Notification

    Due : 08 Feb, 2024 (2 months ago)
    Posted : 3 months ago
    Started : 11 Jan, 2024 (3 months ago)

    23-04-C Fowler Ave & Olive Ave Intersection Improvements The work to be done consists, in general, of installing a new traffic signal, reconstructing the pavement, and widening the intersection of Fowler Avenue and Olive Avenue. The work will also include signing, striping, and pavement marking. Two new drain inlets with storm drain pipe are included as part of the work.

    From: Moore and Bruggink (Co-op)