Type : Pre-Bid Notification
Due : 08 Jun, 2024 (in 1 month)
Posted : 12 months ago
Started : 17 Apr, 2023 (12 months ago)
This will allow the new Tanker Way Gate switch and the existing MacDill Avenue 35MW switch to provide redundancy so that either substation shall be capable of carrying the entire base load.