Search results for: bandwidth and internet connectivity

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 104
  • Bandwidth and Internet Connectivity

    Type : Bid Notification

    Due : 10 Jul, 2023 (9 months ago)
    Posted : 10 months ago
    Started : 16 Jun, 2023 (10 months ago)

    Bid Number:06-029-223-IP-060 Bid Title:Bandwidth and Internet Connectivity Category:RFP/RFQStatus:Open Description: Addendum #1 (PDF)RFP06-029-223-IP-060 Bandwidth and Internet Connectivity-POSTED (PDF)RFP06-029-223-IP-060 Bandwidth and Internet Connectivity_fillable (DOCX) Publication Date/Time: 6/16/2023 12:00 AM Closing Date/Time: 7/10/2023 2:00 PM Return To Main Bid Postings Page

    From: Cedar Park (City)

  • RFP for Bandwidth and Internet Connectivity

    Type : Bid Notification

    Due : 23 Mar, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 02 Mar, 2022 (about 2 years ago)

    Type Request for Proposal Status Issued Number 2022-0303-AC Addendum 2 (RFP for Bandwidth and Internet Connectivity) Issue Date & Time 3/2/2022 08:00:01 AM (CT) Close Date & Time 3/23/2022 01:00:00 PM (CT) Time Left3 hours 26 minutes 49 seconds Notes The City is prevented by the Texas Constitution (Article 11, Section 5) from indemnifying Offerors.

    From: Plano (City)

  • ATDD Internet Connectivity

    Type : Bid Notification

    Due : 16 May, 2017 (about 7 years ago)
    Posted : about 7 years ago
    Started : 09 May, 2017 (about 7 years ago)

    Department of Commerce (DOC), National Oceanic Atmospheric Administration (NOAA), Air Resources Laboratory (ARL), Atmospheric Turbulence Division (ATDD) in Oak Ridge, TN, requires continuation and possible upgrade of existing Internet connection to provide increased bandwidth for our ever-expanding Internet connectivity needs. The Internet connection must support existing computer hardware.

    From: Federal Government (Federal)

  • Internet Service Provider

    Type : Bid Notification

    Due : 24 Aug, 2022 (20 months ago)
    Posted : 21 months ago
    Started : 27 Jul, 2022 (21 months ago)

    Option to provide DDoS protection services in conjunction with vendor Internet Service. C. Connectivity Requirements 1. Internet connectivity must be provisioned through a 10Gbps fiber Ethernet interface. 2. Bandwidth leased by the College must be dedicated solely to the College from the College’s demarcation point to the Internet backbone. 3.

    From: Community College of Allegheny (Higher Education)

  • Internet Service Provider

    Type : Bid Notification

    Due : 14 Apr, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 18 Mar, 2022 (about 2 years ago)

    Connectivity Requirements 1. Internet connectivity must be provisioned through a 10Gbps fiber Ethernet interface. 2. Bandwidth leased by the College must be dedicated solely to the College from the College’s demarcation point to the Internet backbone. 3. The physical connectivity between the College’s demarcation point and the Internet Service Provider’s point-of-presence (POP) cannot be shared. 4.

    From: Community College of Allegheny (Higher Education)

  • HART Project Network Connectivity

    Type : Bid Notification

    Due : 26 Jul, 2022 (21 months ago)
    Posted : 22 months ago
    Started : 06 Jul, 2022 (22 months ago)

    Quantity 36 Unit of Measure MONTH Title Recurring Collocation Connectivity and Equipment Housing Description a. Provide dedicated secure connectivity (minimum 1 Gbps symmetrical bandwidth) from 1099 Alakea Street, Honolulu, HI 96813 network node to the collocation (3375 Koapaka Street node), WAN (all other network nodes), and the internet. b.

    From: Hawaii (State)

  • DA01--Interactive Patient Care System Services Veterans Integrated Service Network 04 (VISN04)

    Type : Bid Notification

    Due : 15 Feb, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 02 Feb, 2022 (about 2 years ago)

    Facility Internet Connectivity PWS 5.3.1, 6.3.3 3.C. What bandwidth requirement does the vendor have for their system to operate successfully? How much headroom is needed to account for peak data usage? 3.D. Each facility within VISN04 has a different type of existing internet connectivity, found in section 5.3.1.2 of the PWS. What solutions does the vendor propose to best meet the internet requirements?

    From: Federal Government (Federal)