Type : Bid Notification
Laboratory tests confirm that existing coating of the barge slip contains lead.
Laboratory tests confirm that existing coating of the barge slip contains lead.
Interested bidders will meet at Whitter Barge Slip. Tunnel access is every hour each direction so please plan travel appropriately. Please dress for weather, PPE including hardhats, safety vests, and steel toe boots will be required. Attachment A: Planset/Drawings
Prospective offerors are invited to a site visit at the Port of Benton barge slip in Richland, Washington and U.S. Department of Energy’s Hanford site as detailed in the solicitation. All RFP questions shall be submitted electronically as directed in the solicitation.
IT IS THE RESPONIBILITY OFPOTENTIAL OFFERORS TO MONITOR THE GPE FOR ADDITIONAL INFORMATION PERTAINING TO THIS REQUIREMENT.”REQUIREMENT INFORMATION:The minimum requirement of the contract is to transport (by towing), a barge loaded with one or more sealed packages containing radioactive material and dangerous waste from Puget Sound Naval Shipyard & Intermediate Maintenance Facility (PSNS & IMF), Bremerton, Washington, to the Port of Benton barge slip
NOTICE OF INTENT TO AWARD A SOLE SOURCEPuget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF) intends to Sole Source Award to a Service-disabled Veteran-owned Small Business Concern (SDVOSB) Dunlap Towing Company Cage Code 08ZD9, La Conner, WA 98257 for the towing service of US Navy barges loaded with RCD packages from PSNS & IMF, Bremerton, WA, to the Port of Benton barge slip, near Richland, Washington.
LEGAL DESCRIPTION: Within Sec. 25, T16N, R16W, Kateel River Meridian ACTIVITY: The Department of Natural Resources (DNR), Division of Mining, Land, and Water (DMLW) has renewed a land use permit for dredging material to create a barge slip. DATES OF USE: Start: August 26, 2019 End: August 25, 2024 DEADLINE: October 18, 2019 The purpose of this notice is to inform the public that a permit was issued for this activity.
The materials barge would be tied to the construction barge, and materials would be moved from the staging barge to the construction barge and project site by a crane on the construction barge.