Search results for: barracks renovation

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 275
  • 218047 CBJTC Barracks Renovation Building 2018 Addendum 1

    Type : Bid Notification

    Due : 27 May, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 23 Apr, 2021 (about 3 years ago)

    Downloadable Files for Advertisement VersionDescriptionTypeRequired Original 218047 CBJTC Barracks Renovation Building 2018 Pre-Bid Meeting Agenda (Open/Save/View) Complete Document Original 218047 CBJTC Barracks Renovation Building 2018 Pre-Bid Meeting Sign In Sheet (Open/Save/View) Complete Document 001 218047 AKL ADDENDUM - ANNOTATED (Open/Save/View) Complete Document indicates a required (not withdrawn) file   For

    From: Florida Department of Management Services (State)

  • 218047 CBJTC Barracks Renovation Building 2018 ITB

    Type : Bid Notification

    Due : 27 May, 2021 (about 2 years ago)
    Posted : about 3 years ago
    Started : 23 Apr, 2021 (about 3 years ago)

    Downloadable Files for Advertisement VersionDescriptionTypeRequired Original 218047 CBJTC Barracks Renovation Building 2018 ITB (Open/Save/View) Complete Document Original 218047 CBJTC Barracks Renovation Building 2018 Exhibit 4-5 (Open/Save/View) Complete Document Original 218047 CBJTC Barracks Renovation Building 2018 Site Map (Open/Save/View) Complete Document Original 218047 CBJTC Barracks Renovation Building 2018 Non Tech Specs (Open

    From: Florida Department of Management Services (State)

  • 221004 CBJTC Barracks Renovation Building 2008 Notice of Intent to Award

    Type : Bid Notification

    Due : 15 Jul, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 15 Jun, 2021 (about 2 years ago)

    Commodities: 72121100 Commercial and office building construction services 72121103 Commercial and office building renovation and repair service   Date June 15, 2021 Project Number and Name 221004 CBJTC Barracks Renovation Building 2008Firm Name Browning’s Construction, Inc.Firm Location Starke, FLAward Amount $281,500.00The State of Florida Department of Military Affairs Construction and Facility Management Office has recommended that the

    From: Florida Department of Management Services (State)

  • Hammerhead Barracks Renovation at Fort Hood, Texas

    Type : Bid Notification

    Due : 19 Nov, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 05 Nov, 2019 (about 4 years ago)

    Title: W9126G20R0017, Hammerhead Barracks Renovation, Fort Hood, TexasFort Worth District Corps of Engineers Soliciting Comments on the Potential Use of Project Labor Agreements (PLAs) atU.S.

    From: Federal Government (Federal)

  • 14000 Block H-Frame Barracks Renovation

    Type : Bid Notification

    Due : 27 Dec, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 06 Dec, 2018 (about 5 years ago)

    Renovations shall increase the life expectancy of the Barracks by 25-years.

    From: Federal Government (Federal)

  • Hammerhead Barracks Renovation (B10005 and B10007), Fort Hood, Texas

    Type : Bid Notification

    Due : 23 Apr, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 08 Apr, 2021 (about 3 years ago)

    The project is for the design and construction of two existing Hammerhead Barracks Renovation, 10000 block to include B10005 & B10007 at Fort Hood, Texas. Each barracks building is 3-Stories, has a basement, and includes Company Operations Facilities that contain two arms vaults and chemical room (Gas Mask and similar equipment).

    From: Federal Government (Federal)

  • Notice of Intent Brand Name Items-Hammerhead Barracks Renovation B10020, B10021 and B10022

    Type : Bid Notification

    Due : 21 May, 2022 (23 months ago)
    Posted : about 2 years ago
    Started : 12 May, 2022 (23 months ago)

    Renovations will include: Complete renovation of, the basement NBC (nuclear, biological, chemical) suite storage, basement arms rooms, excavation of the basement crawl space and renovation into TA50 locker rooms, first floor COF, Standing Seam Metal Roofs, Exterior Finishes, Interior Finishes (Walls/Ceilings/Floors), Reconfiguration of 2nd and 3rd Floors Barrack Rooms, Replacement of underground chilled water piping, New HVAC Systems (DOAS, Hydronic

    From: Federal Government (Federal)