Search results for: basins and lakes

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 1,677
  • Meadow Lake Catch Basins

    Type : Bid Notification

    Due : 07 May, 2024 (in 4 days)
    Posted : 11 days ago
    Started : 19 Apr, 2024 (13 days ago)

    See more details...

    From: Louisiana (State)

  • Meadow Lake Catch Basins

    Type : Bid Notification

    Due : 07 May, 2024 (in 5 days)
    Posted : 10 days ago
    Started : 06 Apr, 2024 (25 days ago)

    Meadow Lake Catch Basins----The Parish requires a Contractor to expand/enhance existing structure(s) to increase area drainage by Remove/Replace/Repair concrete panels, interior/exterior pipe joints and catch basins, located in Meadow Lake Subdivision, Meadow Lake Dr E (R08M075; S12-T9S-R14E) ; Meadow Lake Dr W (R08M076; S12-T9S-R14E) ; Edgemere Ct (R08M079; S12-T9S-R14E) ; Edgemere Dr (R08M078; S12-T9S-R14E) ; Rosemeade Dr (R08M087; S12-T9S-R14E)

    From: St Tammany Parish (Other)

  • BOTH ORBITAL AND IN SITU DATASETS HAVE DEMONSTRATED THE EXISTENCE OF ANCIENT PALEOLAKE BASINS THAT WERE FED BY DEEPLY INCISED VALLEYS ON EARLY MAR...

    Type : Contract

    Due : 13 Aug, 2021 (about 2 years ago)
    Posted : about 3 years ago
    Started : 29 Jun, 2020 (about 3 years ago)

    BOTH ORBITAL AND IN SITU DATASETS HAVE DEMONSTRATED THE EXISTENCE OF ANCIENT PALEOLAKE BASINS THAT WERE FED BY DEEPLY INCISED VALLEYS ON EARLY MARS. ALTHOUGH THE EVIDENCE THAT THESE VALLEYS AND LAKES ... Solicitation ID/Procurement Identifier: 80NSSC17K0442 Ultimate Completion Date: Fri Aug 13 17:00:00 GMT 2021

    From: Federal Procurement Data System (Federal)

  • GAOA 4CV Mackinaw CG-Fish Lake Basin Rec Area DM Reduce Project - Phase 2

    Type : Pre-Bid Notification

    Due : 15 Jun, 2024 (in 1 month)
    Posted : 6 months ago
    Started : 04 Apr, 2024 (27 days ago)

    Presolicitation NoticeGAOA 4CV Mackinaw CG-Fish Lake Basin Rec Area DM Reduce Project - Phase 21240LT24R0004Project Description:This project includes reconstruction of the Mackinaw Campgrounds (Little Mackinaw, Mackinaw and Mackinaw Extension Campgrounds).The work includes:Removal and disposal of existing campground site furniture, demolition and removal of designated restrooms, and asphalt pulverizing.Constructing new asphalt roads and spurs.Constructing

    From: Federal Government (Federal)

  • Mapping and Tracking Floodplain Functions and Values in the Lake Champlain Basin

    Type : Bid Notification

    Due : 14 Jun, 2019 (about 4 years ago)
    Posted : about 5 years ago
    Started : 09 May, 2019 (about 5 years ago)

    The Vermont Department of Environmental Conservation (DEC) is preparing to request services to create a methodology and maps for the Lake Champlain Basin to quantify existing and potential floodplain function. The resulting products are expected to help identify and track priority protection and restoration projects and be made available through outreach and training of watershed organizations and other natural resources restoration partners.

    From: Vermont (State)

  • Stormwater Retention Basin revetment Removal for Lake 5-1

    Type : Bid Notification

    Due : 10 Nov, 2023 (5 months ago)
    Posted : 6 months ago
    Started : 27 Oct, 2023 (6 months ago)

    Stormwater Retention Basin revetment Removal for Lake 5-1 Project Description :D2. SCOPE OF WORK D2.1 The Work to be done under the Contract shall consist of removal of existing revetment stone and geotextile fabric at Lake 5-1. D2.2 The major components of the Work are as follows: (a) The ripping, excavation, removal and disposal of approximately 620m3 of existing revetment stone material.

    From: MerX (Federal)

  • Stormwater Ditches, Basins and Lakes Ground Maintenance

    Type : Contract

    Due : 11 Aug, 2022 (20 months ago)
    Posted : about 3 years ago
    Started : 12 Aug, 2019 (about 4 years ago)

    See more details...

    From: City of Orlando (City)