Search results for: bathymetric support

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 10
  • SURVEY SERVICES FOR HYDRAULIC MODELLING

    Type : Bid Notification

    Due : 10 Nov, 2022 (17 months ago)
    Posted : 18 months ago
    Started : 26 Oct, 2022 (18 months ago)

    SURVEY SERVICES FOR HYDRAULIC MODELLING Project Description :Undertake bathymetric and topographic survey to support hydraulic modelling, on the Little Saskatchewan River from Lake Audy Dam to the confluence with the Assiniboine River.

    From: MerX (Federal)

  • Professional Services for Watercourse Surveys

    Type : Bid Notification

    Due : 14 Feb, 2023 (14 months ago)
    Posted : 15 months ago
    Started : 16 Jan, 2023 (15 months ago)

    The City of Kitchener wishes to retain a professional services provider with expertise in surveying, watercourse engineering, and fluvial geomorphology to undertake a topographic and bathymetric survey of watercourse structures and watercourse cross-sections in support of 1D and 2D hydraulic modeling of watercourses, inline hydraulic structures, and floodplains in InfoWorks ICM hydraulic modeling software.

    From: Kitchener (City)

  • Notice of Intent to Sole Source Riegl VQ-840-G Bathymetric Laser Scanning System

    Type : Pre-Bid Notification

    Due : 15 Jul, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 08 Jul, 2020 (about 3 years ago)

    Army Corps of Engineers (USACE), Engineer Research and Development Center (ERDC), Cold Regions Research Laboratory (CRREL) intends to award a contract on a sole source basis to Riegl USA, Inc. upon the basis of the authority provided at FAR 13.501(a)(1)(i).ERDC-CRREL intends to procure one (1) Riegl VQ-840-G bathymetric laser scanning system and accessories to support coastline, shallow water, river ways, and hydraulic engineering infrastructure mapping

    From: Federal Government (Federal)

  • Notice Request for Proposals - Bathymetric Survey

    Type : Bid Notification

    Due : 24 Oct, 2023 (6 months ago)
    Posted : 6 months ago
    Started : 05 Oct, 2023 (6 months ago)

    However, without the requisite bathymetric data, the development of the detailed engineering design is not possible. The availability of the bathymetric data will also permit an accurate calculation of the downstream benefit in terms of the degree to which the flood levels would be reduced.The site is owned by the City of Orange and is located within the South Mountain Reservation in Essex County.

    From: Millburn (Town)

  • Multiple Hurricane Recovery Construction Projects at Biscayne National Park

    Type : Bid Notification

    Due : 22 Nov, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 07 Nov, 2019 (about 4 years ago)

    Topographic and bathymetric survey will be required. Geotechnical Analysis will be required.251215A Repairs to Park Entrance Road: Hurricane IRMA storm surge eroded the shoreline and is undercutting the park entrance road. In some areas, the shoreline has eroded to less than a car-length distance between the entrance road and the drop-off into the canal waters.

    From: Federal Government (Federal)

  • Y--BISC Multiple Hurricane Repairs

    Type : Pre-Bid Notification

    Due : N/A
    Posted : about 3 years ago
    Started : 10 Sep, 2020 (about 3 years ago)

    Topographic and bathymetric survey will be required. Geotechnical Analysis will be required. 251215A Repairs to Park Entrance Road: Hurricane IRMA storm surge eroded the shoreline and is undercutting the park entrance road. In some areas, the shoreline has eroded to less than a car-length distance between the entrance road and the drop-off into the canal waters.

    From: Federal Government (Federal)

  • Architect and Engineering (AE) Services to Support the Sabine Pass to Galveston Bay, Coastal Storm Risk Management and Ecosystem Restoration, Orange

    Type : Bid Notification

    Due : 07 May, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 19 Dec, 2019 (about 4 years ago)

    Early Contractor Involvement; (10) Survey, to include support to both design (land and bathymetric survey) and real estate acquisition; (11) Geotechnical Investigations in a coastal environment; (12) Stakeholder engagement; and (13) The firm's quality management plan, including quality assurance process, project scheduling, coordination of the in-house work with subconsultants, and prior experience of the prime firm and any significant subconsultant.B

    From: Federal Government (Federal)