energy storage systems (BESS), including BESS control systems, conduits and cables to the power substation, site work grading and paving to support installation of the BESS, and other appurtenant work as specified and shown on the drawings, and the requirements of the SGIP.
Project Title Request for Proposals (RFP) for Battery Energy Storage Systems (BESS), Design-Build Project Invitation # 20220616-01 Bid Posting Date 06/16/2022 9:57 AM (PDT) Project Stage Bidding Bid Due Date 10/20/2022 5:00 PM (PDT) Response Format Electronic Project Type RFP (Request for Proposal) Response Types Response File General Attachment Type of Award Lump Sum Categories 90627 - Energy Management - Architectural 90628 - Energy Conservation
Project: Solar Photovoltaic and Battery Energy Storage System at Bachman Recreation Center Ref. #: CIZ22-BSD-2088 Type: RFP Status: Open Open Date: Jan 18th 2023, 8:00 AM CST Questions Due Date: Feb 14th 2023, 5:00 PM CST Close Date: Feb 24th 2023, 1:00 PM CST Days Left: 18 Project Description:Request for Proposals for design and construction of a Solar Photovoltaic (PV) and Battery Energy Storage System (BESS) Project at Bachman Recreation Center
Contact: Bid Type: OPEN Informal Bid Flag: No Purchase Method: Open Market Pre Bid Conference: BID Conference #1 2PM on June 13, 2018 at the DPW BID Conference #2 2PM on June 20, 2018 at the DPW Bulletin Desc: Sealed Bids for Battery Energy Storage Systems and Electrical Upgrades at Medford Department of Public Works.
A mandatory tour of the Facility is scheduled for January 5, 2022. Qualifications Statements will be solicited through the City’s Supplier Portal: www.boston.gov/departments/procurement . All qualifications statements shall be submitted in conformance with the RFQ and all applicable provisions of law. Qualifications Statement shall be submitted before February 3, 2022 at 4:00 p.m. ET. The RFQ will be available on Monday, November 29, 2021 after 12 o’clock noon, ET.
The purpose of this RFQ is to initiate a competitive bid process to select a highly qualified Delegate Chief Building Official (DCBO) Firm for the construction of Battery Energy Storage Systems (BESS) for the Solar Energy Generating Systems (SEGS) Units VIII and IX Projects is completed on schedule and in accordance with all conditions, and applicable laws, ordinances, regulations, and standards (LORS).
The BESSs will be connected to the solar PV systems for clean energy charging as well as to the Project P-1238 Construction of Grid Stability & Resiliency 10 MW Battery Energy Storage, Various Buildings at Marine Corps Air Ground Combat Center, Twentynine Palms, California Apr 15, 2022 12:03:02 AM GMT 1 installation's electric distribution system for utility power or on-site cogeneration system charging.
UOM Requested Delivery P1 Battery Energy Storage System 1 EA - Each 39121017 - Power distribution units PDUs | 5752 $5k, 8250 Battery Energy Storage System per attachment on Buyer Attachments Ship-To-Address - Attn Dr.
View 2019-PGEREIM-MSE Closed Battery Energy Storage System 1/29/2019 2:00:00 PM Pacific