Search results for: beam position monitor

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 14
  • Beam Position Monitor System

    Type : Bid Notification

    Due : 14 Oct, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 09 Oct, 2020 (about 3 years ago)

    Beam Position Monitor (BPM) system

    From: Federal Government (Federal)

  • Beam Position Monitor (BPM) Assembies

    Type : Bid Notification

    Due : 29 Sep, 2023 (7 months ago)
    Posted : 8 months ago
    Started : 17 Aug, 2023 (8 months ago)

    FERMI RESEARCH ALLIANCE, LLC (FRA) REQUESTS YOUR FIRM FIXED PRICE PROPOSAL FOR THE FOLLOWING "Beam Position Monitor (BPM) Assembly Per Drawing - F10152143_B_DWG1" IN ACCORDANCE WITH THE TERMS & CONDITIONS AND ATTACHMENTS INCORPORATED INTO THIS REQUEST FOR PROPOSAL BY REFERENCE.*See zipped file "RFP346236 for details*

    From: Federal Government (Federal)

  • X-Band Cavity Radio Frequency Beam Position Monitor

    Type : Bid Notification

    Due : 11 Feb, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 07 Feb, 2019 (about 5 years ago)

    Fabricate X-Band Cavity Radio Frquency Beam Position Monnitor (RFBPM) per SLAC SOW, Engineering Spec and Drawing for LCLS II (Linac Coherent Light Source II) Undulator System at SLAC National Accelerator Laboratory, Menlo Park, California

    From: Federal Government (Federal)

  • EIC HSR BPM Cryo-Cable Assembly

    Type : Bid Notification

    Due : 02 Oct, 2023 (7 months ago)
    Posted : 7 months ago
    Started : 22 Sep, 2023 (7 months ago)

    The Cable Assemblies will be used to carry beam position monitor radio frequency electrical signals through the cryostat insulating vacuum, from the liquid helium cooled cryogenic BPM feedthrough to the room temperature insulating vacuum to air feedthrough.

    From: Federal Government (Federal)

  • XBPM Electronics – GRID Controls

    Type : Bid Notification

    Due : 26 May, 2021 (about 2 years ago)
    Posted : about 3 years ago
    Started : 13 May, 2021 (about 3 years ago)

    The APS Upgrade Project (APS-U) requires high performance X-Ray Beam Position Monitors (XBPM) to measure the beam orbit and trajectory. The APS-U XBPM drive system consists of a stepper motor, limit switches, a potentiometer, and air control equipment. This equipment will be controlled by electronics hardware located in the mezzanine. Nineteen high heat load front ends and sixteen canted undulator front ends front ends will be installed.

    From: Federal Government (Federal)

  • RFI HW-07162021 Pre-Staging Assembly

    Type : Pre-Bid Notification

    Due : 09 Aug, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 16 Jul, 2021 (about 2 years ago)

    A typical raft assembly consists of an Ultra High Vacuum (UHV) chamber which includes an inline ion pump and beam position monitors (BPMs); Raft assemblies 1 and 4 include four electromagnet assemblies each, and Raft assemblies 2 and 3 include three electromagnet assemblies each. Each of the 36 dipole assemblies consist of one large bend electromagnet and a UHV assembly with support fixtures that are secured to the electromagnet body. 

    From: Federal Government (Federal)

  • HOLTER MONITOR SCANNING SERVICES.

    Type : Contract

    Due : 22 Dec, 2025 (in 19 months)
    Posted : about 3 years ago
    Started : 23 Dec, 2020 (about 3 years ago)

    HOLTER MONITOR SCANNING SERVICES. Solicitation ID/Procurement Identifier: 36C24221C0061 Ultimate Completion Date: Mon Dec 22 18:00:00 GMT 2025

    From: Federal Procurement Data System (Federal)