Refine your Search
Apply several filters to get precise search results
Filters Applied Clear
Bid NotificationPre-Bid NotificationAwardContractActiveArchived
Search results for: bedding
Showing opportunity 1 - 10 of 27
  • 6515--BEDDING DISPENSER AND DISPOSAL

    Type : Bid Notification
    Due : 16 Nov, 2022 (in 10 months)
    Posted : 2 months ago
    Started : 09 Nov, 2021 (2 months ago)

    Program Options Accommodate minimum of 3 cage styles Wheels and Locks Bedding Accommodations Corncob bedding Aspen Bedding Electrical Hook Up Standard outlet in room Facility volume Accommodate up to 5000 cages a week Assembly The plug and play design, no need for compressed air or facility redesign. V. PERIOD OF PERFORMANCE: The Period of Performance is 30 Days ARO.

    From: Federal Government (Federal)
  • <b>BEDDING</b> DISPENSER AND DISPOSAL

    BEDDING DISPENSER AND DISPOSAL

    Type : Contract
    Due : 10 Jan, 2022 (8 days ago)
    Posted : 1 month ago
    Started : 10 Dec, 2021 (1 month ago)

    BEDDING DISPENSER AND DISPOSAL Solicitation ID/Procurement Identifier: 36C25022Q0110 Ultimate Completion Date: Mon Jan 10 18:00:00 GMT 2022

    From: Federal Procurement Data System (Federal)
  • Cedar Rapids Flood Risk Management Project, Reach 1 McLoud Run Lower Reach Channel, Culverts and Levee

    Type : Pre-Bid Notification
    Due : 01 Feb, 2022 (in 13 days)
    Posted : 2 months ago
    Started : 22 Dec, 2021 (27 days ago)

    McLoud Run Lower Reach Levee (OPTION B): The work includes, but is not limited to: site demolition; trench excavation; sheet pile installation; construction of levee embankment; toe drain installation; riprap and bedding stone placement; site restoration; and landscaping. Estimated Range: More than $10,000,000.

    From: Federal Government (Federal)
  • RI-138A, Aquidneck Ave (East Main Rd to Green End Ave)

    Type : Bid Notification
    Due : 21 Jan, 2022 (in 2 days)
    Posted : 1 month ago
    Started : 16 Dec, 2021 (1 month ago)

    RIC 2019-CH-092 ADDENDUM 2 COVER LETTER.pdf 2. 2019-CH-092 Contract Book_AddendumNo2.pdf 3. 2019-CH-092 Plans_AddendumNo2.pdf 4. Federal Wage Rates_AddendumNo2.pdf 5. 2019-CH-092 Distribution of Quantities_AddendumNo2.pdf 6. RIC 2019-CH-092 ADDENDUM 1 COVER LETTER.pdf Solicitation Addenda 1.

    From: Rhode Island (State)
  • ANIMAL FEED AND <b>BEDDING</b>; RHI5K85C6T (QTY: 1,440); RHI50E6C6N (480); RHI5058C6N (120); SHE1008 (1,440); AND SHE1012 (1,680)

    ANIMAL FEED AND BEDDING; RHI5K85C6T (QTY: 1,440); RHI50E6C6N (480); RHI5058C6N (120); SHE1008 (1,440); AND SHE1012 (1,680)

    Type : Contract
    Due : 28 Apr, 2023 (in 15 months)
    Posted : 1 month ago
    Started : 07 Dec, 2021 (1 month ago)

    ANIMAL FEED AND BEDDING; RHI5K85C6T (QTY: 1,440); RHI50E6C6N (480); RHI5058C6N (120); SHE1008 (1,440); AND SHE1012 (1,680) Solicitation ID/Procurement Identifier: RFQ-NIAID-2099966 Ultimate Completion Date: Fri Apr 28 17:00:00 GMT 2023

    From: Federal Procurement Data System (Federal)
  • Coronado National Forest Bathrooms Restoration

    Type : Bid Notification
    Due : 24 Jan, 2022 (in 5 days)
    Posted : 1 month ago
    Started : 05 Jan, 2022 (13 days ago)

    This workincludes providing bedding material and establishment of FFE. 4.Construction of concrete walks and slabs, and a concrete stairway with railing. 5.Installation of trash bins and picnic tables. 6.Relocation of water hydrant and drain pit, and trash bins. 1.3 – Location and Conditions Project locations are •Bear Canyon Overlook is in Sabino Canyon Recreation Area.•Camp Rucker is located in the Chiricahua Mountains on Forest Road 74E.

    From: Federal Government (Federal)
  • Amendment 1 Edited Section M and Included additional Pictures

    Type : Bid Notification
    Due : 24 Jan, 2022 (in 5 days)
    Posted : 5 days ago
    Started : 13 Jan, 2022 (5 days ago)

    This workincludes providing bedding material and establishment of FFE. 4.Construction of concrete walks and slabs, and a concrete stairway with railing. 5.Installation of trash bins and picnic tables. 6.Relocation of water hydrant and drain pit, and trash bins. 1.3 – Location and Conditions Project locations are •Bear Canyon Overlook is in Sabino Canyon Recreation Area.•Camp Rucker is located in the Chiricahua Mountains on Forest Road 74E.

    From: Federal Government (Federal)
  • Grand Isle and Vicinity, West Jetty Spur Dike, Jefferson Parish, Louisiana Ed 22-018

    Type : Pre-Bid Notification
    Due : 07 Mar, 2022 (in 1 month)
    Posted : 5 days ago
    Started : 13 Jan, 2022 (5 days ago)

    The work consists of constructing a stone spur on the west jetty at Grand Isle; including placing stone and geotextile; bedding construction; and other incidental work. (The estimated time of completion is 80 calendar days after receipt of notice to proceed).  The solicitation will include 6 drawings and specifications). The estimated magnitude of construction on this project is between $1,000,000.00 and $5,000,000.00. 

    From: Federal Government (Federal)
  • Cottonwood Island Pile Dike Repair

    Type : Bid Notification
    Due : 21 Jan, 2022 (in 2 days)
    Posted : 11 days ago
    Started : 07 Jan, 2022 (11 days ago)

    Other features of the work include installation of new steel king/marker piles at the offshore end of the offset timber piles structures and enrockments, placement of new rock scour aprons around the newly installed timber piles structures for the full length of pile installation, and installation of new rock shore connections from the newly installed timber piles structures connected to the landward end of the rock apron extending shoreward.

    From: Federal Government (Federal)
  • Rough River Cutoff Wall & Outlet Works: Industry Day

    Type : Bid Notification
    Due : 30 Jan, 2022 (in 11 days)
    Posted : 26 days ago
    Started : 14 Jan, 2022 (4 days ago)

    A 300 feet long concrete apron must be constructed in this area to protect the lower shale from desiccation.  Approximately 100 feet of the new retreat channel earthwork, grading, bedding stone, and KYTC Class III Channel Lining must be constructed inside the sheetpile seepage cutoff protected area upstream of Station 25+30.

    From: Federal Government (Federal)