Search results for: bell mouth for main

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 8 of 8
  • BELL MOUTH FOR MAIN DEWATERING PUMP MODEL 1650-DF-V, MANUFACTURER ILJIN -Drawing Attached

    Type : Bid Notification

    Due : 10 Oct, 2022 (18 months ago)
    Posted : 19 months ago
    Started : 10 Feb, 2022 (about 2 years ago)

    Material Description 1) BELL MOUTH FOR MAIN DEWATERING PUMP MODEL 1650-DF-V, MANUFACTURER ILJIN -Korea | QTY : 01 EA Drawing attached PLEASE ATTACH DATA SHEET AND PICTURES ALONG YOUR QUOTE "Note 1- " Your offer should be submitted with detailed specifications like dimensions, quality, brand (with photos) and other.

    From: ASYAD’s Drydock (Co-op)

  • Supply of New Pump Bell Mouth and Casing With Wearing for Dock Main Dewatering Pump 01 each

    Type : Bid Notification

    Due : 21 Mar, 2023 (13 months ago)
    Posted : 13 months ago
    Started : 20 Feb, 2023 (14 months ago)

    TENDER NUMBER:ADC-20213-012TENDER TITLE: Supply of New Pump Bell Mouth and Casing With Wearing for Dock Main Dewatering Pump 01 eachINSTRUCTIONS TO BID:1. Download attached RFQ2. Pay the tender fee of RO 10/-. This tender fee is non-refundable.

    From: ASYAD’s Drydock (Co-op)

  • TL2314/300152 – Torrey Life Science MCB Lab Renovations

    Type : Bid Notification

    Due : 23 Jul, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 18 Jun, 2020 (about 3 years ago)

    Rectangular Main to Rectangular Branch: Bell-mouth or 45-degree entry. b. Rectangular Main to Round Branch: Bell-mouth. c. Divided Supply Flow Branches Above 1,000 FPM and Primary Ductwork: Types 1, 2W, 4A and 4B are acceptable. d. Divided Supply Flow Branches 1,000 FPM and Below and Secondary Ductwork: Types 1, 2W, 3, 4A and 4B are acceptable. e. Divided Return Flow Branches Above 1,000 FPM: Types 1, 2W, 4A and 4B are acceptable. 2.

    From: University of Connecticut (Higher Education)

  • Greenwich High School Cardinal Stadium Phase 1 Mandatory Walk-through (Mask required) Change of opening date and other important information

    Type : Bid Notification

    Due : 10 Dec, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 25 Nov, 2020 (about 3 years ago)

    AutoCAD SHX Text MAIN OR BRANCH DUCT AutoCAD SHX Text LIMIT FLEXIBLE DUCT RUN OUTS TO 6'. AutoCAD SHX Text BELL MOUTH CONNECTION TO MAIN OR BRANCH DUCT MAY ALSO BE USED. AutoCAD SHX Text VOLUME DAMPER AutoCAD SHX Text CEILING SUPPORTS. DO NOT SUPPORT DUCTWORK FROM CEILING SUPPORTS. AutoCAD SHX Text CEILING "T" BAR. TYPICAL AutoCAD SHX Text CEILING DIFFUSER WITH OPPOSED BLADE VOLUME DAMPER AutoCAD SHX Text ACOUSTIC TILE SUSPENDED CEILING SHOWN.

    From: Greenwich Public Schools (School)

  • Greenwich High School Cardinal Stadium Phase 1 Mandatory Walk-through (Mask required)

    Type : Bid Notification

    Due : 10 Dec, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 25 Nov, 2020 (about 3 years ago)

    AutoCAD SHX Text MAIN OR BRANCH DUCT AutoCAD SHX Text LIMIT FLEXIBLE DUCT RUN OUTS TO 6'. AutoCAD SHX Text BELL MOUTH CONNECTION TO MAIN OR BRANCH DUCT MAY ALSO BE USED. AutoCAD SHX Text VOLUME DAMPER AutoCAD SHX Text CEILING SUPPORTS. DO NOT SUPPORT DUCTWORK FROM CEILING SUPPORTS. AutoCAD SHX Text CEILING "T" BAR. TYPICAL AutoCAD SHX Text CEILING DIFFUSER WITH OPPOSED BLADE VOLUME DAMPER AutoCAD SHX Text ACOUSTIC TILE SUSPENDED CEILING SHOWN.

    From: Greenwich Public Schools (School)