Type : Bid Notification
Due : 25 Apr, 2024 (in 2 days)
Posted : 18 days ago
Started : 04 Apr, 2024 (18 days ago)
Installation of the piers will occur primarily from a marine-based crane barge although some piles may be placed from a shore-based crane, if accessible.Haul out piers support piles, both vertical and batter, will be installed primarily with a vibratory hammer. It is anticipated that the largest size vibratory hammer used for the project will be an APE 200-6 or comparable vibratory hammer from another manufacturer, such as ICE.