Search results for: bikeways plan for city

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 40
  • Trails & Bikeways Plan for City of Cedar Rapids & Linn County

    Type : Bid Notification

    Due : 06 Oct, 2022 (19 months ago)
    Posted : 19 months ago
    Started : 14 Sep, 2022 (19 months ago)

    CDT on Thursday, October 6, 2022 , for development of a comprehensive trails and bikeways plan for the City of Cedar Rapids and Linn County, as requested by the City of Cedar Rapids Public Works Department . The City will only accept bids submitted through the City’s Online E-Procurement portal system (IonWave). Email, fax or hard copy Submittals are not acceptable.

    From: City of Cedar Rapids (City)

  • 2nd & 3rd Street Bike Infrastructure Phase 2

    Type : Bid Notification

    Due : 29 May, 2024 (in 28 days)
    Posted : 4 days ago
    Started : 25 Apr, 2024 (6 days ago)

    The City of Richmond is accepting bids for the construction of 2nd / 3rd Street Bike Infrastructure, Ph 2 (UPC 118804) to provide general contracting services that include but are not limited to converting existing on-street parking into a two-way cycle track that is protected by a buffer and parked vehicles on 3rd Street from Franklin Street to Byrd Street. Bike improvement along 2 nd Street starts at Spring Street to Byrd Street.

    From: Richmond (City)

  • Request for Qualification & Proposals for Developing and Documenting Nexus Findings Required by the California Fee Mitigation Act (AB1600) to Support the Imposi...

    Type : Bid Notification

    Due : 24 Jul, 2023 (9 months ago)
    Posted : 10 months ago
    Started : 19 Jun, 2023 (10 months ago)

    Work will include ensuring the updated study is consistent with the City’s current General Plan, Downtown Specific Plan, Bikeways and Trails Master Plan, Active Transportation Plan, South Livermore Valley Specific Plan, and the Livermore Area Recreation and Parks District (LARPD) Master Plan and standards.

    From: Livermore (City)

  • Transit Development Plans

    Type : Contract

    Due : 30 Jun, 2025 (in 14 months)
    Posted : 8 months ago
    Started : 18 Aug, 2023 (8 months ago)

    Box 2239 Springfield, Oh 45502-1214 City of Springfield, Ohio dba Springfield City Area Transit 2021 Annual Agency Profile Mr.

    From: Ohio Department of Transportation (State)

  • Plans and Design Concepts for Creation & Improvement of "Safe Routes to School" & Possible Bike Routes

    Type : Bid Notification

    Due : 15 Apr, 2024 (15 days ago)
    Posted : 16 months ago
    Started : 31 Mar, 2023 (13 months ago)

    The Plan shall have the following components:\n\n(1) Building upon a prior report of FHI Consultants, the Plan shall evaluate and make\nappropriate recommendations as to the nature and route of a pedestrian SRTS from\n(A) the intersection of Elm Rock Road and the White Plains Road (a/k/a State Rt 22) -\n- where plans are already underway to install an RFB pedestrian crosswalk across Rt\n22 (the \u201cRt. 22 Crosswalk\u201d) to (B) the existing RFB

    From: Bronxville (Village)

  • RFQ - Bi-State Sustainable Reinvestment Corridor

    Type : Bid Notification

    Due : 19 Dec, 2023 (4 months ago)
    Posted : 4 months ago
    Started : 04 Dec, 2023 (4 months ago)

    /Transportation-Plans-and-Studies/Special-studies-and-projects/Kansas-City-Regional-Bikeway-Plan" target="_blank">https://www.marc.org/Transportation/Plans-Studies/Transportation-Plans-and-Studies/Special-studies-and-projects/Kansas-City-Regional-Bikeway-Plan

    From: Mid America Regional Council (State)

  • Bike-share project

    Type : Bid Notification

    Due : 27 Oct, 2023 (6 months ago)
    Posted : 18 months ago
    Started : 12 Oct, 2022 (18 months ago)

    6 Tie-Break: As per the State of Massachusetts’s recommended tie-breaking policy, in the event that there is a tie bid between two (2) responsive and responsible bidders, the award of the contract will be determined by a coin toss. The bidder whose submission was received earliest shall be assigned “Heads” in the coin toss. In the event that there is a tie bid with three (3) or more responsive and responsible bidders, the award shall be made by a draw by lot limited to those bidders. The coin toss/draw by lot shall be scheduled within two (2) business days from when it was determined by the Town to be a tie bid. The bidders involved shall be given an opportunity to attend. The coin toss/drawing shall be witnessed by at least three (3) Town ...

    From: Sharon (Town)