Search results for: black point bridge repair

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 35
  • Black Point Bridge Repair

    Type : Bid Notification

    Due : 20 May, 2022 (23 months ago)
    Posted : about 2 years ago
    Started : 15 Apr, 2022 (about 2 years ago)

    barge collision related damage to the Black Point Swing Bridge.

    From: Sonoma Marin Area Rail Transit (Transportation)

  • L.B. Knox Bridge Deck Repair

    Type : Bid Notification

    Due : 16 May, 2024 (in 16 days)
    Posted : 16 days ago
    Started : 12 Apr, 2024 (17 days ago)

    Post InformationPosted At:Fri, Apr 12, 2024 8:00 AMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:NoOverviewSummaryThe County of Volusia, Department of Public Works, Road & Bridge Division, is seeking a single, responsive and responsible bidder for the L.B. Knox Bridge Deck Repair Project in Ormond Beach, Florida.

    From: Volusia (County)

  • Bridge rail replacement.

    Type : Bid Notification

    Due : 05 Jun, 2024 (in 1 month)
    Posted : 6 hours ago
    Started : 14 Apr, 2024 (15 days ago)

    04-2Q4604 Bridge rail replacement. Department of Transportation 06/05/2024 2:00PM PDT Posted

    From: California (State)

  • Bridge Deck Replacement & Bridge Removal

    Type : Bid Notification

    Due : 10 Apr, 2024 (19 days ago)
    Posted : 1 month ago
    Started : 13 Mar, 2024 (1 month ago)

    Bids will be received for this Project, which includes the following: The Work to be performed under the Contract for Project No. 43-24-03 consists of removing a mainline bridge, embankment construction and replacing with roadway on grade, repairing bridge superstructure components, including: bridge deck replacement, replacing bridge deck joints; rehabilitating bearing devices; substructure repairs; sealing of construction joints; slope repairs;

    From: Ohio Turnpike and Infrastructure Commission (State)

  • replacement of the bridge

    Type : Bid Notification

    Due : 28 Aug, 2023 (8 months ago)
    Posted : 8 months ago
    Started : 13 Aug, 2023 (8 months ago)

    The City of Rockwood is seeking sealed bids for the replacement of the bridge located at W. Wheeler St. (Near 309 W. Wheeler) Rockwood, TN. 37854. The bid shall include a 12’ x 5’ box culvert, footers, blocks for head wall, concrete sides, necessary stone, replacement of water line, labor and necessary equipment costs. Bidders must possess a contractor’s license and be insured. For more information, please contact the City Recorder or Building Inspector at 865-354-0611. Bids must be received by the close of business (4:30 p.m.) on Monday, August 28, 2023. Bids will be reviewed at the regularly scheduled council meeting that evening at 6:00 p.m. The City Council has the right to accept or reject any or all bids. Address bids to Becky ...

    From: Rockwood (City)

  • US-12 Capital Interchange Bridges Deck Repair

    Type : Bid Notification

    Due : 28 Aug, 2023 (8 months ago)
    Posted : 8 months ago
    Started : 08 Aug, 2023 (8 months ago)

    08 August 2023 US-12 Capital Interchange Bridges Deck Repair US-12 Capital Interchange Bridges Deck Repair 08 August 2023 Open 8/8/2023 2:00 PM MDT Type Invitation For Bid Close 8/28/2023 2:00 PM MDT Number MDT-315341-RP Currency US Dollar Sealed Until 8/28/2023 2:00 PM MDT Payment Terms 0% 0, Net 30 08 August 2023 Contacts Richele Parkhurst rparkhurst@mt.gov Phone +1 406-546-8243 08 August 2023 Commodity Codes Commodity Code Description 5023 Transportation Goods & Services - Pavement Preservation Services 5003 Transportation Goods & Services - Asphalt Mix Materials 5017 Transportation Goods & Services - Highway Maintenance 5026 Transportation Goods & Services - Road Oil 0...

    From: Montana Acquisition and Contracting System (State)

  • Removal of damaged bridge and placement of temporary bridge

    Type : Bid Notification

    Due : 23 Aug, 2023 (8 months ago)
    Posted : 8 months ago
    Started : 09 Aug, 2023 (8 months ago)

    The bridge install at Fisher Folly Drive will be a fifty-foot single lane bridge, this will require 2 full size tractor trailer loads, or if using a smaller trailer 3-4 loads. The bridge will require waste blocks abutments to sit on, this will require 4 waste blocks. The bridge will require an unpaved approach on each end, the length of the approach will be roughly 30 feet to transition up to top of the temporary bridge deck.

    From: Vermont (State)