Search results for: blenheim-gilboa spillway wall

Refine your Search
Apply several filters to get precise search results
Filters Applied Clear
Bid NotificationPre-Bid NotificationArchived
Showing opportunity 1 - 2 of 2
  • Chief Joseph Dam Spillway Monolith Sealing

    Type : Bid Notification
    Due : 10 Sep, 2021 (15 months ago)
    Posted : 16 months ago
    Started : 03 Sep, 2021 (15 months ago)

    Four water stops are located at spillway monoliths joints 11/12, 15/16, 17/18, and 18/19 and shall be installed from the ogee. Drilling from the spillway roadway is not allowed. The spillway ogee crest is at elevation 901.5 feet (NGVD29). Normal reservoir elevations range from 950 to 956 feet (NGVD29). Work on the spillway ogee will require special construction access and a drilling platform.

    From: Federal Government (Federal)
  • Smithville Wall Drain

    Type : Pre-Bid Notification
    Due : 10 Aug, 2021 (16 months ago)
    Posted : 21 months ago
    Started : 03 Aug, 2021 (16 months ago)

    The US Army Corp of Engineers, Kansas City District, has a need for Construction Activities for the Smithville Dam, Wall Drain Inspection Modification The work covered by this contract consists of the furnishing of all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction.

    From: Federal Government (Federal)
Refine your Search
Apply several filters to get precise search results
Filters Applied Clear
Bid NotificationPre-Bid NotificationArchived