Search results for: blvd east bridge drainage

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 43
  • Las Colinas Blvd East Bridge Drainage Project

    Type : Bid Notification

    Due : 24 May, 2022 (23 months ago)
    Posted : 23 months ago
    Started : 29 Apr, 2022 (about 2 years ago)

    Las Colinas Boulevard Bridge located between N. O’Connor Boulevard and Fuller Drive, approximately 600 feet north of N. O’Connor Boulevard. 2.)     Las Colinas Boulevard Bridge between N. O’Connor Boulevard and Mandalay Drive approximately 700 feet south of N. O’Connor Boulevard. 3.)     Las Colinas Boulevard Bridge located between Wingren Drive and Brazos Drive, approximately 1005 feet south of Wingren Drive.

    From: Irving (City)

  • Las Colinas Blvd East Bridge Drainage Project

    Type : Bid Notification

    Due : 20 May, 2022 (23 months ago)
    Posted : about 2 years ago
    Started : 29 Apr, 2022 (about 2 years ago)

    Las Colinas Boulevard Bridge located between N. O’Connor Boulevard and Fuller Drive, approximately 600 feet north of N. O’Connor Boulevard. 2.)     Las Colinas Boulevard Bridge between N. O’Connor Boulevard and Mandalay Drive approximately 700 feet south of N. O’Connor Boulevard. 3.)     Las Colinas Boulevard Bridge located between Wingren Drive and Brazos Drive, approximately 1005 feet south of Wingren Drive.

    From: Irving (City)

  • Rehabilitation of Shore Drive Bridge Over Little Creek

    Type : Bid Notification

    Due : 28 May, 2024 (in 24 days)
    Posted : 1 day ago
    Started : 02 May, 2024 (1 day ago)

    The Work under this project includes installing an epoxy deck overlay, applying waterproofing to concrete on bridge and approach railing pedestal, fascia, fascia beams, light post support precast cladding, and substructure, performing structural concrete repairs, painting of the aluminum railing, repair and replacing select tree grate frames, and other minor site civil related work.BackgroundAll Requests for Information (RFIs) shall be submitted no

    From: Norfolk (City)

  • Rehabilitation of Shore Drive Bridge Over Little Creek

    Type : Bid Notification

    Due : 28 May, 2024 (in 24 days)
    Posted : 1 day ago
    Started : 02 May, 2024 (1 day ago)

    The Work under this project includes installing an epoxy deck overlay, applying waterproofing to concrete on bridge and approach railing pedestal, fascia, fascia beams, light post support precast cladding, and substructure, performing structural concrete repairs, painting of the aluminum railing, repair and replacing select tree grate frames, and other minor site civil related work.

    From: Norfolk (City)

  • Replacement of Bridge Structure No. A3.3 on East Broad Street (C.R. 543) (AKA Riverton Road) Over Pompeston Creek

    Type : Bid Notification

    Due : 27 Oct, 2042 (in about 18 years)
    Posted : 21 months ago
    Started : 21 Jul, 2022 (21 months ago)

    The County of Burlington received bids for Replacement of Bridge Structure No. A3.3 on East Broad Street (C.R. 543) (AKA Riverton Road) Over Pompeston Creek (CPU-21-0011-C) on May 25, 2021 at 10:30 AM (local time). Attached are scanned copies of the bid packages submitted.

    From: Burlington (County)

  • Project Development Services District Bridge Project (Rehabilitation), Bridge Deck Overlays on I-65 over Lafayette Rd.

    Type : Bid Notification

    Due : 13 Aug, 2024 (in 3 months)
    Posted : 1 month ago
    Started : 12 Mar, 2024 (1 month ago)

    The selected firm shall complete an Engineering Assessment (if necessary), Topographic Survey, Roadway and Bridge Rehabilitation Design and Plan Development, Environmental Documentation, Permits Applications, Right-of-Way Plan Development (including R/W Engineering, Title Research and Staking, if needed), Geotechnical Engineering, Utility Coordination, Pavement Design, and Construction Phase Services.

    From: Indiana Department of Transportation (Transportation)

  • Replacement Bridge D-38 Carrying CR-519 (Wantage Avenue) Over Dry Brook Tributary

    Type : Bid Notification

    Due : 07 Feb, 2024 (2 months ago)
    Posted : 3 months ago
    Started : 23 Jan, 2024 (3 months ago)

    - Replacement of Sussex County Bridge D-38-Addendum #2Read more...Feb 14th 2024, 9:37 AM EST - SHEET 47 REVISION 1 DEMOLITION AND EXCAVATION PLAN 20240202-S.pdfOtherDocument - Replacement of Sussex County Bridge D-38-Addendum #1Read more...Feb 2nd 2024, 9:38 AM EST - SHEET 47 REVISION 2 DEMOLITION AND EXCAVATION PLAN 20240208.pdfOtherDocument - Replacement of Sussex County Bridge D-38-Addendum #2Read more...Feb 14th 2024, 9:37 AM EST - Sussex Bridge

    From: Sussex (County)