Search results for: bmp effectiveness

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 22
  • A&E On-Call Stormwater BMP Development, BMP Effectiveness, Evaluation and Water Quality Monitoring Services

    Type : Bid Notification

    Due : 22 Jul, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 21 Jun, 2021 (about 2 years ago)

    Caltrans is soliciting Statements of Qualifications (SOQs) from qualified firms that may lead to the award of a contract for on-call Stormwater BMP Development, BMP Effectiveness, Evaluation and Water Quality Monitoring Services Estimated contract amount $4,800,000 - $7,800,000 5% DVBE Participation Goal Required

    From: California (State)

  • A&E - on-call Best Management Practices (BMP) Development, BMP Effectiveness, Evaluation and Water Quality Monitoring services

    Type : Bid Notification

    Due : 17 Aug, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 16 Jul, 2021 (about 2 years ago)

    Caltrans is soliciting Statements of Qualifications (SOQs) from qualified firms that may lead to the award of a contract for on-call Best Management Practices (BMP) Development, BMP Effectiveness, Evaluation and Water Quality Monitoring services.

    From: California (State)

  • Professional Stormwater Management Engineering Services

    Type : Bid Notification

    Due : 07 Mar, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 03 Feb, 2023 (13 months ago)

    TMDL water body evaluation, study, and/or BMP implementation effectiveness study/evaluation. 12. Environmental services for wetland evaluation and mitigation. 13. Wetland determination and mitigation. 14. Utility location and mitigation. Based on City needs, the location of the project management team will be evaluated along with other outlined requirements.

    From: Winter Park (City)

  • MUHJ 22-0032, Basewide strategic planting

    Type : Bid Notification

    Due : 11 Sep, 2022 (18 months ago)
    Posted : 19 months ago
    Started : 12 Aug, 2022 (19 months ago)

    Overall, the strategic plantings approach will be established topartner with on-going BMP development/construction to increase their effectiveness, cohesiveness andsustainability goals. Expansion of the HEC-RAS model and ArcPro platforms to capture strategic plantings, allows forthe cost effective, maximum use of tools already being utilized by the installation.

    From: Federal Government (Federal)

  • Street Sweeping

    Type : Bid Notification

    Due : 24 Aug, 2022 (19 months ago)
    Posted : 18 months ago
    Started : 09 Aug, 2022 (19 months ago)

    Contracting staff whose primary job duties are related to implementation of BMPs shall be adequately trained to effectively implement, operate, and maintain such BMPs and must be versed in factors affecting BMP effectiveness. The contractor shall certify they have received all applicable training to implement the requirements in Municipal NPDES Permit No. CAS004004 and shall provide documentation to that effect to the City. S.

    From: Lomita (City)

  • Request For Proposal – I-70 Exit 173 Water Quality Improvements

    Type : Bid Notification

    Due : 07 Jan, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 07 Jan, 2020 (about 4 years ago)

    The goal of the project is to increase water quality treatment effectiveness, potentially adding filtration to capture sediment, oil, metals and salts. For this project the consultant will evaluate water quality BMP’s, develop a ranking based on treatment effectiveness, constructability, cost of install, and cost of maintenance of each BMP.  Read more

    From: Vail (Town)

  • Qualifications for Engineering Services Messer Pond Watershed-base Implementation Plan, Field Survey of Bog & Tracy Roads

    Type : Bid Notification

    Due : 23 Oct, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 08 Oct, 2020 (about 3 years ago)

    Each proposed BMP will be documented as to its: a) Cost to implement b) Time to implement c) Effectiveness at mitigating nutrient and sediment loading using the methods specified by the project’s SSPP d) Ongoing maintenance costs 4. All site locations, site details and possible BMPs will be summarized on project sheets and reviewed on site with the MPPA, NLDPW and NHDOT. OTHER TERMS AND CONDITIONS OF SERVICE: 1.

    From: New Hampshire Department of Administrative Services (State)