Search results for: bmp management

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 17
  • W912BU24B0002 - Prompton Boat Launch Paving

    Type : Bid Notification

    Due : 19 Apr, 2024 (3 days ago)
    Posted : 2 months ago
    Started : 04 Apr, 2024 (18 days ago)

    Additionally, the contractor will be responsible to design a BMP for storm-water management and obtain necessary permits through Wayne County, PA.Bonding will be required; at the time of bid opening, by separate Bid Bonds; and after award but before Notice to Proceed, Performance and Payment Bonds will be required.

    From: Federal Government (Federal)

  • Kennard Park Improvements

    Type : Bid Notification

    Due : 31 May, 2024 (in 1 month)
    Posted : 1 month ago
    Started : 29 Feb, 2024 (1 month ago)

    Stormwater BMP’s should be included to meet the City’s Stormwater Management Code (see General Responsibilities for more information) * Note: Programming priorities listed above are intended as a general guide and shall be confirmed with the community through the engagement process.

    From: Pittsburgh (City)

  • Retrofit Existing DRAs for BMP Weeki Wachee Phase 2

    Type : Bid Notification

    Due : 06 May, 2024 (in 12 days)
    Posted : 1 month ago
    Started : 28 Feb, 2024 (1 month ago)

    SOLICITATION # 24-C00673/JGFORRetrofit Existing DRAs for BMP Weeki Wachee Phase 2The Board of County Commissioners of Hernando County, Florida, ("the County"), is soliciting Vendors/Contractors that are active in the retrofitting Stormwater DRA's to use best management practices (BMP's).Offers for furnishing the above will be received and accepted up to 10:00 am, local time, Monday, May 6, 2024, via the Hernando County Procurement Department eProcurement

    From: Hernando (County)

  • CONDUCT BEST <b>MANAGEMENT</b> PRACTICES (<b>BMP</b>) MONITORING AS REQUIRED BY THE CHEROKEE NATIONAL FOREST (CNF) REVISED LAND AND RESOURCE <b>MANAGEMENT</b> PLAN (RLRMP 2004).

    CONDUCT BEST MANAGEMENT PRACTICES (BMP) MONITORING AS REQUIRED BY THE CHEROKEE NATIONAL FOREST (CNF) REVISED LAND AND RESOURCE MANAGEMENT P...

    Type : Contract

    Due : 31 Dec, 2025 (in 20 months)
    Posted : 1 month ago
    Started : 08 Mar, 2024 (1 month ago)

    CONDUCT BEST MANAGEMENT PRACTICES (BMP) MONITORING AS REQUIRED BY THE CHEROKEE NATIONAL FOREST (CNF) REVISED LAND AND RESOURCE MANAGEMENT PLAN (RLRMP 2004). Solicitation ID/Procurement Identifier: 12444024P0019 Ultimate Completion Date: Wed Dec 31 18:00:00 GMT 2025

    From: Federal Procurement Data System (Federal)

  • THE PROJECT CONSISTS OF BEST <b>MANAGEMENT</b> PRACTICE (<b>BMP</b>) UPGRADES AND ROAD IMPROVEMENT WORK, TO INCLUDE BUT NOT LIMITED TO DRAIN DIP CONSTRUCTION, CULVERT INSTALLATION, AND ROADWAY RECONDITIONING.

    THE PROJECT CONSISTS OF BEST MANAGEMENT PRACTICE (BMP) UPGRADES AND ROAD IMPROVEMENT WORK, TO INCLUDE BUT NOT LIMITED TO DRAIN DIP CONSTRUCTION, C...

    Type : Contract

    Due : 01 Aug, 2024 (in 3 months)
    Posted : 19 days ago
    Started : 05 Apr, 2024 (17 days ago)

    THE PROJECT CONSISTS OF BEST MANAGEMENT PRACTICE (BMP) UPGRADES AND ROAD IMPROVEMENT WORK, TO INCLUDE BUT NOT LIMITED TO DRAIN DIP CONSTRUCTION, CULVERT INSTALLATION, AND ROADWAY RECONDITIONING. Solicitation ID/Procurement Identifier: 1240LU24Q0021 Ultimate Completion Date: Thu Aug 01 17:00:00 GMT 2024

    From: Federal Procurement Data System (Federal)

  • C. Reiss Slip Sediment Remediation

    Type : Bid Notification

    Due : 16 Apr, 2024 (6 days ago)
    Posted : 2 months ago
    Started : 22 Apr, 2024 (Yesterday)

    Implement various Best Management Practices (BMPs) to minimize turbidity. Dewater the dredged material as specified and filter the collected carriage water to remove contaminants to standards described in specifications. Place the material in the prescribed staging area, as indicated on the contract drawings and in the specifications. Clean-up the site and demobilize when dredging work is completed.

    From: Federal Government (Federal)

  • Climate Adaptation - Project Level Capital Improvement Plan - RFP for Engineering Services

    Type : Bid Notification

    Due : 19 Apr, 2024 (3 days ago)
    Posted : 1 month ago
    Started : 22 Mar, 2024 (1 month ago)

    The project represents phase 2 of a comprehensive effort to retrofit the drainage system in the project area, incorporate water quality Best Management Practices (BMPs), and preliminary designs for critical improvements. This project will be funded by state and local funds, a majority of which will be from the state's Sustainable Transportation Planning Grant Program.

    From: Yuba (County)