Search results for: boiler plant and water

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 1,063
  • BOILER PLANT WATER TREATMENT

    Type : Contract

    Due : 31 Mar, 2028 (in about 3 years)
    Posted : 13 months ago
    Started : 01 Apr, 2023 (13 months ago)

    BOILER PLANT WATER TREATMENT Solicitation ID/Procurement Identifier: 36C24623Q0505 Ultimate Completion Date: Fri Mar 31 17:00:00 GMT 2028

    From: Federal Procurement Data System (Federal)

  • Z--528A4-19-210 BATAVIA BOILER PLANT WATER CORRECTIONS

    Type : Bid Notification

    Due : 02 Mar, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 08 Apr, 2020 (about 4 years ago)

    THIS IS A PRE-SOLICITATION NOTICE SYNOPSIZING AN UPCOMING COMPETITIVE SOLICITATION SATISFYING THE REQUIREMENTS OF FAR 5.201 AND 5.203 AN INVITATION FOR BIDS WILL BE POSTED ON OR ABOUT JANUARY 30, 2020 Canteen Buried Piping Batavia, NY VA Medical Center Procurement Number: 36C24220B0016 Project Number: 528A4-19-210 The Batavia VA Medical Center (VAMC) will be posting a solicitation to provide all labor, materials, tools, equipment and supervision necessary to perform work under project number 528A6-19-210 titled Boiler Plant Water Corrections. The general scope of this project is to correct the water piping that feeds four (4) boilers. All work will be accomplished on the Batavia VAMC site as ...

    From: Federal Government (Federal)

  • Y1DA--Replace Water Softener in Boiler Plant Northport VA Medical Center, NY.

    Type : Bid Notification

    Due : 29 Sep, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 21 Sep, 2021 (about 2 years ago)

    Observe the first two service and regeneration cycles, and train Boiler Plant Operators on operation and maintenance of the unit. See specifications for details. Task 4: Provide field and analytical laboratory analytical reports documenting the influent and effluent water quality. Task 5: Provide a one-year maintenance contract that includes quarterly inspections and water quality analytical reports.

    From: Federal Government (Federal)

  • Repair Water Softener Filtration System - Boiler Plant

    Type : Bid Notification

    Due : 25 Mar, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 18 Mar, 2022 (about 2 years ago)

    Repair Water Softener Filtration System - Boiler Plant. See attached. 

    From: Federal Government (Federal)

  • N--New-Temple Boiler Plant Gas and Water Pressure Sensors New Panel with a Field controller. (VA-18-00147998)

    Type : Bid Notification

    Due : 21 Sep, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 04 Sep, 2018 (about 5 years ago)

    General: A request to furnish and install in the boiler plant at the Temple VA Medical Center, 1901 Veterans Memorial Dr, Temple, TX 76504. Installation of one gas pressure sensor on the incoming gas supply and one water pressure sensor on the incoming water supply. The sensors will be connected to the JCI controller by the condensate return tank. The points will be mapped to the supervisory controller.

    From: Federal Government (Federal)

  • J045--BOILER PLANT WATER TREATMENT BASE RFQ

    Type : Bid Notification

    Due : 17 Mar, 2023 (13 months ago)
    Posted : 14 months ago
    Started : 28 Feb, 2023 (14 months ago)

    Center Boiler Plant Water Treatment

    From: Federal Government (Federal)

  • J--Water Treatment Services - Boiler Plant / Cooling Tower

    Type : Bid Notification

    Due : 22 Oct, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 17 Oct, 2018 (about 5 years ago)

    The vendor shall provide all labor and supervision to conduct water treatment services for four boilers in the Boiler Plant, the high temp hot water heating boiler at the BRAC, and one Cooling Tower. The Vendor will also provide water testing services and provide recommendations for the proper operation of 26 Closed Loop and Open Loop systems.

    From: Federal Government (Federal)